flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Test method for vertical fenestration installation procedures updated

Codes and Standards

Test method for vertical fenestration installation procedures updated

FGIA issues first update for document created in 2005.


By Peter Fabris, Contributing Editor | December 10, 2020

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) has updated a test method evaluating the performance and durability of the integration of a fenestration product with a building envelope.

AAMA 504-20, Voluntary Laboratory Test Method to Qualify Vertical Fenestration Installation Procedures, was created in 2005. This marks the document’s first update.

Manufacturers should be aware that they are ultimately responsible for providing adequate installation instructions for their products, according to an FGIA news release. However, the document can serve as a guide.

“AAMA 504 provides a standardized test method for all manufacturers to verify their various installation instructions in a consistent manner,” said Joe Hayden vice chair of the Test Method to Qualify Installation Procedures Update Task Group and a Pella Corporation executive.

Related Stories

Codes and Standards | Jun 17, 2020

Santa Fe is second city in the world to achieve LEED v4.1 Gold

New Mexico community gained credits for resilience planning, including public health crises.

Codes and Standards | Jun 15, 2020

NSF International’s Checked by NSF program helps businesses reopen safely

Includes third-party validation of COVID-19 preventive measures.

Codes and Standards | Jun 15, 2020

Workers want policy changes before they return to offices

More office cleaning, work from home opportunities, and staying home when sick among the desired adjustments.

Codes and Standards | Jun 12, 2020

Carbon emission legislation prompts commercial real estate to innovate

Mass timber, augmented reality, and modular construction among the trends.

Codes and Standards | Jun 11, 2020

USGBC offers new pilot credit to address green cleaning and COVID-19

Provides guidance on cleaning and disinfecting buildings using green cleaning best practices.

Codes and Standards | Jun 10, 2020

AIA issues tools for reducing risk of COVID-19 transmission in buildings

Tailored strategies offered for offices, retailers, schools, and senior living facilities.

Codes and Standards | Jun 8, 2020

OSHA construction safety inspections fall 84% during COVID-19 pandemic

Agency focuses on preventing disease transmission in healthcare industry.

Codes and Standards | Jun 8, 2020

5 must reads for the AEC industry today: June 8, 2020

Frank Lloyd Wright sites set to reopen and construction jobs rise by 464,000.

Codes and Standards | Jun 8, 2020

Reopened offices raise liability risk for businesses and owners

Risks may not be covered by property insurance.

Codes and Standards | Jun 4, 2020

American Wood Council updates report on fire resistance of wood members and assemblies

Provides new examples and background on mass timber calculations.

boombox1
boombox2
native1

More In Category

Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



Contractors

Conflict resolution is a critical skill for contractors

Contractors interact with other companies seventeen times a day on average, and nearly half of those interactions (eight) involve conflicts, according to a report by Dodge Construction Network and Dusty Robotics. The study suggests that specialty trade contractors, in particular, rarely experience good resolution from conflicts. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021