flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Test method for vertical fenestration installation procedures updated

Codes and Standards

Test method for vertical fenestration installation procedures updated

FGIA issues first update for document created in 2005.


By Peter Fabris, Contributing Editor | December 10, 2020

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) has updated a test method evaluating the performance and durability of the integration of a fenestration product with a building envelope.

AAMA 504-20, Voluntary Laboratory Test Method to Qualify Vertical Fenestration Installation Procedures, was created in 2005. This marks the document’s first update.

Manufacturers should be aware that they are ultimately responsible for providing adequate installation instructions for their products, according to an FGIA news release. However, the document can serve as a guide.

“AAMA 504 provides a standardized test method for all manufacturers to verify their various installation instructions in a consistent manner,” said Joe Hayden vice chair of the Test Method to Qualify Installation Procedures Update Task Group and a Pella Corporation executive.

Related Stories

Codes and Standards | Aug 4, 2020

Virginia is the first state to adopt COVID-19 worker safety rules

Include social distancing requirements, notifications when co-worker tests positive, timelines to return to work after recovery.

Codes and Standards | Aug 3, 2020

Report aids local governments on policy options, pathways to electrify new buildings

Document focuses on switching appliances and equipment away from natural gas, propane.

Codes and Standards | Jul 30, 2020

Institute for Market Transformation acquires Energy-Efficient Codes Coalition

Goal is to achieve net-zero construction by 2050.

Codes and Standards | Jul 29, 2020

Crackdowns grow on construction firms that fail to follow COVID-19 guidelines

States, cities, and OSHA enforce social distancing, hand-washing regulations.

Codes and Standards | Jul 28, 2020

California utility adopts climate emergency declaration

Sacramento-region company commits to working towards carbon neutrality by 2030.

Codes and Standards | Jul 23, 2020

North Carolina will stop relying on FEMA flood mapping

State will identify flood zones on its own.

Codes and Standards | Jul 22, 2020

New version of IAPMO’s Water Demand Calculator is available

Enhanced features include selection between single- and multifamily buildings.

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

boombox1
boombox2
native1

More In Category

Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



Contractors

Conflict resolution is a critical skill for contractors

Contractors interact with other companies seventeen times a day on average, and nearly half of those interactions (eight) involve conflicts, according to a report by Dodge Construction Network and Dusty Robotics. The study suggests that specialty trade contractors, in particular, rarely experience good resolution from conflicts. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021