flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Teaching on the cutting edge of design

University Buildings

Teaching on the cutting edge of design

University of Illinois at Urbana Champaign Campus Instructional Facility will celebrate and foster creativity and interdisciplinary cooperation.


By Jonathan Barnes, Contributing Editor | April 24, 2019

The University of Illinois at Urbana Champaign's new centrally located SOM facility will celebrate and enhance connections between engineering and construction. That focus, and the open-learning approach of the structure which will be completed in 2021, relect changes in the AEC industry. All renderings: Smilodon

University of Illinois at Urbana-Champaign Chancellor Robert Jones and local academic and civic leaders recently broke ground on a new Campus Instructional Facility that is meant to celebrate the cooperation between architecture and engineering.

The structure celebrates how architecture and engineering work together and is meant to enhance such collaboration. Designed by Skidmore, Owings & Merrill LLP (SOM), the building will have flexible, open spaces for learning. It also will include collaboration spaces that will be flexible enough to meet the evolving needs of the university community.

 

See Also: Curtin University library redevelopment will modernize iconic campus structure

 

“The design of the Campus Instructional Facility blends the rich history of the University of Illinois with its progressive, technology-focused approach to learning. In designing the building, we sought to celebrate the intersection of architecture and engineering, while creating an environment where experimentation and invention could thrive,” says Brian Lee, Design Partner.

Situated adjacent to the main engineering quadrangle at Springfield Avenue and West Wright Street, the building will be used for contemporary teaching and learning, with a variety of types of spaces designed to enhance collaboration between students and faculty. Additionally, this focus is meant to encourage and develop new hands-on learning technologies.

 

 

“The Campus Instructional Facility Project will ensure that we continue to create learning environments that inspire collaboration and interactive education for our students. We believe this facility will be a catalyst for innovation and creativity,” says Chancellor Robert Jones.

The 122,000-square-foot, four-story building will have spaces for lecture, classroom, collaboration, social environments, and for other uses. A central spine in the building brings together its public spaces and enables views across all floors as well as views of the engineering quadrangle. A 60-foot long-span space with flexible partitions will allow large class configurations; classrooms will be distributed along the building’s core. A 500-seat auditorium will be in the basement. The building’s 23 active learning and traditional classrooms will range in size, from small spaces for as few as 24 students, to the large auditorium

 

 

The building is scheduled to be completed in 2021. It’s state-of-the-art approach to learning reflects the dynamic nature of technological and organizational change in the architecture, engineering, and construction industry. Tech tools are bringing various disciplines together, creating smarter projects.

“SOM was built on the importance of collaboration between architects and engineers, and that spirit continues to be championed today. We are thrilled to have the opportunity to create a home for interdisciplinary learning and have an impact on the education of future students,” says William F. Baker, Structural Engineering Partner, and University of Illinois Engineering alumnus.

Related Stories

University Buildings | Apr 26, 2017

UMass Amherst is home to America’s first CLT academic building

The building brings the architecture, landscape architecture, and building technology departments under one roof.

Sponsored | Ceilings | Apr 17, 2017

University of Toronto Scarborough Campus building meets aesthetic, performance and sustainability goals with Rockfon ceiling systems

The University of Toronto’s $52.5 million, 126,788-square-foot Environmental Science & Chemistry Building is the newest addition to the Scarborough campus in Toronto, Ontario, Canada.

Products and Materials | Mar 28, 2017

Mondopads highlight Portland State University’s new Decision Theater

A total of seven InFocus Mondopads were used in the room to accommodate large group work and individual study.

University Buildings | Mar 14, 2017

Fresh off NCAA national title, Clemson opens plush football operations complex

The 142,500-sf facility, which opened just three weeks after Clemson’s national championship win over the University of Alabama, adjoins the indoor practice facility and outdoor practice fields, consolidating football operations into one complex.

University Buildings | Mar 8, 2017

Massive mixed-use residential village on USC’s Los Angeles campus on schedule to open this fall

Prefabrication of the six buildings’ walls reduced construction time by a year. 

School Construction | Feb 26, 2017

A new survey finds education construction activity going strong this year

Surveys of school districts and colleges, though, raise questions about financing for future projects.  

University Buildings | Jan 10, 2017

UMass Amherst’s Isenberg School of Business to receive modern, twisted addition from BIG

The 70,000-sf building was developed in collaboration with Boston-based Goody Clancy.

University Buildings | Jan 9, 2017

Massive student housing project in Texas will be ready this Fall

Developers hope the early opening of some units sets the tone for the community and future rentals.

University Buildings | Dec 5, 2016

University of Chicago to open new education center in Hong Kong

The new facility will be named for University Trustee, Francis Yuen, and his wife Rose Wai Man Lee Yuen.

University Buildings | Nov 18, 2016

Stephen F. Austin State University’s new STEM building breaks ground

Kirksey Architecture designed the building that ‘will serve as a landmark for SFA.’

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021