flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tall mass timber code changes receive final approval

Codes and Standards

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.


By Peter Fabris, Contributing Editor | January 3, 2019
Wood planks

Courtesy Pixabay

The International Code Council (ICC) has approved all 14 of the tall mass timber code change proposals.

The proposals create three new types of construction (Types IV-A, IV-B and IV-C), which set fire safety requirements, and allowable heights, areas, and number of stories for tall mass timber buildings. The new provisions will be included in the 2021 International Building Code (IBC).

The three new types of construction that will be included in the 2021 IBC are:

· Type IV-A – Maximum 18 stories, with gypsum wallboard on all mass timber elements.

· Type IV-B – Maximum 12 stories, limited-area of exposed mass timber walls and ceilings allowed.

· Type IV-C – Maximum 9 stories, all exposed mass timber designed for a 2-hour fire resistance.

“The addition of tall mass timber to the International Building Code provides a comprehensive set of safety standards for these new types of construction,” said American Wood Council Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “This vote caps off several years of scientific research and testing, and verifies that mass timber meets the robust performance standards called for by our nation’s building codes.”

Related Stories

Codes and Standards | Oct 26, 2018

Tall Mass Timber code proposals approved at Intl. Code Council public comment hearings

Proposals now go to online voting; final outcome expected in December.

Codes and Standards | Oct 25, 2018

Low-income neighborhoods could benefit most from green roofs

Those areas face the biggest risk from extreme heat.

Codes and Standards | Oct 24, 2018

Building design critical to prevent school shootings

Safety must be balanced with welcoming environment.

Codes and Standards | Oct 23, 2018

Codes in Florida Panhandle made buildings vulnerable to Hurricane Michael

Less stringent codes in northern parts of state linked to devastation.

Codes and Standards | Oct 19, 2018

Global Green Tag production certification standard will launch in U.S. at end of year

Australian program recognized by WELL, claims compliance with LE.

Codes and Standards | Oct 18, 2018

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

FEMA dollars pay for reconstruction, but local decision-makers ignore climate change impacts.

Codes and Standards | Oct 17, 2018

Philadelphia plumbing code will now allow for more use of plastic pipes in high rises

Of the 50 largest U.S. cities, Philadelphia is one of just six that still require metal pipes.

Codes and Standards | Oct 16, 2018

New Disaster Recovery Reform Act will support adoption of updated building codes

Provides incentives for communities to modernize and enforce codes.

Codes and Standards | Oct 12, 2018

Boston ‘housing emergency’ prompts regional initiative for new residential construction

Mayors of 15 cities set goal of 185,000 new homes by 2030.

Codes and Standards | Oct 11, 2018

On-site staff key to energy benchmarking project for property management company

Manager training, data sharing are critical to meeting 20% utility cost reduction goal.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021