flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tall mass timber code changes receive final approval

Codes and Standards

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.


By Peter Fabris, Contributing Editor | January 3, 2019
Wood planks

Courtesy Pixabay

The International Code Council (ICC) has approved all 14 of the tall mass timber code change proposals.

The proposals create three new types of construction (Types IV-A, IV-B and IV-C), which set fire safety requirements, and allowable heights, areas, and number of stories for tall mass timber buildings. The new provisions will be included in the 2021 International Building Code (IBC).

The three new types of construction that will be included in the 2021 IBC are:

· Type IV-A – Maximum 18 stories, with gypsum wallboard on all mass timber elements.

· Type IV-B – Maximum 12 stories, limited-area of exposed mass timber walls and ceilings allowed.

· Type IV-C – Maximum 9 stories, all exposed mass timber designed for a 2-hour fire resistance.

“The addition of tall mass timber to the International Building Code provides a comprehensive set of safety standards for these new types of construction,” said American Wood Council Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “This vote caps off several years of scientific research and testing, and verifies that mass timber meets the robust performance standards called for by our nation’s building codes.”

Related Stories

Codes and Standards | Dec 19, 2018

Guidance for water utilities on indoor recycled water use released

Provides recommended ranges on 13 different parameters of water quality.

Codes and Standards | Dec 18, 2018

Development in Africa, Asia, and uptake in air conditioning will require more efficient buildings

Dramatic action will be needed for global building sector to cut carbon in line with international agreements.

Codes and Standards | Dec 14, 2018

Emissions for buildings and construction have peaked, UN says

Greener buildings have led to leveling off of GHGs.

Codes and Standards | Dec 13, 2018

Urban flooding causing economic loss, social disruption, and housing inequality

Extensive suburban development, aging and poorly maintained infrastructure, and more intense rainfall mean more flooding.

Codes and Standards | Dec 12, 2018

California’s transportation problems could prevent state from reaching carbon reduction goals

Governor’s carbon neutral-by-2045 ambitions at odds with car culture.

Codes and Standards | Dec 11, 2018

Strict seismic building codes credited with minimizing damage in Alaskan earthquake

Magnitude 7.0 temblor cracked roads and collapsed road ramps, but buildings held up well.

Codes and Standards | Dec 7, 2018

Florida tops ABC’s 2018 Merit Shop Scorecard rankings

Michigan rose fastest after passing prevailing wage law.

Codes and Standards | Dec 6, 2018

North American steel yields lower GHG emissions than Chinese steel

North American construction steel saves about half of GHG emissions on building project.

Codes and Standards | Dec 5, 2018

Canadian retailer builds net-zero stores

Other chains also boost green efforts with PVs, EV charging stations.

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021