flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Take a look at the plans for Google’s new 1 million-sf London campus

Office Buildings

Take a look at the plans for Google’s new 1 million-sf London campus

Heatherwick Studio and BIG are designing the 11-story building.


By David Malone, Associate Editor | June 8, 2017

Rendering courtesy of HayesDavidson

Google’s King’s Cross Campus has taken another step forward as the company recently submitted an application for planning permission to Camden Council.

The London HQ, which will be purpose-built and is designed by BIG and Heatherwick Studio, will rise 11 stories and comprise over 1 million sf. Google will occupy 650,000 sf of the new campus. The building will include cafes, gym and pool facilities, a covered multi-use games area, an Events Center, and staff training facilities.

A landscaped roof will include terraces and a walking trail that stretches the length of the building while the ground floor will provide space for retail. “By opening up the ground floor and activating the roofscape, the light and airy workspaces are sandwiched between the terraced gardens on the roof and market halls, auditoria, and shops on the ground,” says Bjarke Ingels, Founding Partner at BIG, in a release.

The building has been designed from a family of interchangeable elements that allow the headquarters’ workspaces to quickly and easily adapt to change. When combined with the current building at 6 Pancras Square and an additional third building, the new campus has the potential to house up to 7,000 Google employees.

 

Rendering courtesy of HayesDavidson.

 

Three main points are laid out about the project’s design in the application’s Executive Summary of Inclusivity:

— The design principles are extremely coherent and aim to produce a building that has a high degree of architectural legibility and therefore ease of use.

— The organization of major floor plates and minor floor plates provides a wide range of features that will assist users in their navigation of what could otherwise be a complex building.

— The ground plane provides a great opportunity for the public to interact with the building, creating permeability and a transition between the private spaces and the public realm.

 

Rendering courtesy of HayesDavidson.

 

If the application is approved, the project could break ground in 2018.

You can view the entire application for planning permission here.

 

Rendering courtesy of HayesDavidson.

 

Rendering courtesy of HayesDavidson.

Related Stories

Building Team Awards | May 26, 2016

Cimpress office complex built during historically brutal Massachusetts winter

Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.

Building Technology | May 24, 2016

Tech is the new office perk, says a new survey of American workers

But most employees still see their companies falling on the dull side of the cutting edge. 

High-rise Construction | May 17, 2016

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 

Architects | May 16, 2016

3 strategies to creating environments that promote workplace engagement

VOA's Pablo Quintana writes that the industry is looking for ways to increase engagement through a mix of spaces suited to employees' desire for both privacy and connection.

Office Buildings | May 9, 2016

Can you make a new building as cool as a warehouse?

CannonDesign's Robert Benson insists that the industry needs to start looking at traditional office spaces differently.

Building Tech | Apr 13, 2016

The Hyperchair gives employees access to their own personal set of climate controls

Not only can the Hyperchair reduce heating and cooling costs and maximize employee comfort, but it can help a company become more environmentally friendly, as well.

Architects | Mar 20, 2016

Ars Gratia Artis: A North Carolina architect emphasizes the value of art in its designs

Turan Duda says clients are receptive, but the art must still be integral to the building’s overall vision.

Office Buildings | Mar 16, 2016

Google releases new plans and renderings of its Mountain View campus

The original canopy design scheme is still in place, but the plans now call for it to be opaque.

Office Buildings | Mar 10, 2016

Expedia unveils design for Seattle waterfront campus

Transparency and outdoor areas will give the complex a Pacific Northwest vibe.  

Office Buildings | Mar 9, 2016

CBRE: Workplace wellness on the rise

As insurance premiums and deductibles continue to rise, both employees and employers are evaluating options to improve their wellbeing, writes CBRE Healthcare Managing Director Craig Beam.

boombox1
boombox2
native1

More In Category

Office Buildings

Unlocking Sustainability: Smart Access in the Coworking Space

Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover 
how choosing the right partners can amplify your green efforts.


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021