flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tahanan supportive housing development brings 145 apartments to San Francisco

Multifamily Housing

Tahanan supportive housing development brings 145 apartments to San Francisco

David Baker Architects designed the project.


By David Malone, Associate Editor | February 2, 2021
Tahanan exterior

All renderings courtesy David Baker Architects

A new modular supportive housing development is currently under construction in San Francisco’s central SOMA District.

Tahanan will offer 145 studio apartments (and one manager’s unit) of permanent housing and services for adults who have experienced homelessness. A poured-in-place concrete podium comprises common areas, a counseling suite, administrative offices, and retail space. The upper five floors of wood-frame construction consist of the modular boxes, with each one containing two apartment units and a corridor. The modules were constructed offsite by Factory OS.

 

Tahanan rear

 

The six-story building is being built via modular construction on a site in the central South of Market neighborhood and is part of the SOMA Filipina’s Cultural District, which was established by the S.F. Board of Supervisors and Planning Department to preserve the cultural diversity of the area with attention to highlighting the culture and contributions of the Filipinx American Community.

 

Tahanan facade

 

This culture is referenced in the building’s name and look. Tahanan is a Tagalog word that evokes the idea of “coming home” or “return home,” while the pattern in the cast concrete is made with traditional handwoven banig mats. Additionally, a mega-graphic of Philippine rice terraces is integrated into the exterior metal skin.

A combined enterprise of Mercy Housing, Tipping Point Community, and the San Francisco Housing Accelerator Fund, this project has been developed in collaboration with S.F.’s Department of Homelessness & Supportive Housing. The project has been under construction since October 2020 and is slated for completion in August 2021.

 

Tahanan entrance

 

Tahanan unit

Related Stories

Codes and Standards | Jul 16, 2015

Berkeley, Calif., adopts balcony inspection program following deadly collapse

Apartment building balconies will be subject to inspections every three years under new regulations adopted following a deadly collapse.

Multifamily Housing | Jul 9, 2015

Melbourne approves Beyoncé inspired skyscraper

The bootylicious tower is composed of 660 apartments and a 160-room hotel at the west end of Melbourne's business district.

Codes and Standards | Jul 8, 2015

California Supreme Court upholds affordable housing requirements

Court cites affordable housing crisis of ‘epic proportions.’

High-rise Construction | Jul 7, 2015

Bjarke Ingels designs Frankfurt skyscraper with a surprise in the middle

Several levels in the center of the 185-meter tower are shifted outward to allow for terraces with city views.

Multifamily Housing | Jul 1, 2015

Baby boomers—not Millennials—will drive demand for apartments long term, according to U.S. Fed study

The volatile U.S. multifamily housing market has returned to pre-recession investment levels, driven largely by Millennials putting off home-buying and settling for rentals, but in the long term it will be baby boomers that will drive the market as they downsize.

High-rise Construction | Jun 23, 2015

The world's best new skyscrapers for 2015

One World Trade Center and Abu Dhabi's Burj Mohammed Bin Rashid Tower are among the four towers named Best Tall Buildings by the Council on Tall Buildings and Urban Habitat.

Multifamily Housing | Jun 22, 2015

MAD Architects unveils first U.S. residential project, in Beverly Hills

The “hillside village” edifice will be covered in drought-tolerant vines and succulents.

High-rise Construction | Jun 15, 2015

Cornell Tech breaks ground on world's first Passive House residential high-rise

To achieve Passive House standards, Cornell Tech Residential will incorporate a number of sustainability-focused design elements. The façade, constructed of a prefabricated metal panel system, acts as a thermally insulated blanket wrapping the building structure. 

Wood | Jun 2, 2015

Michael Green Architecture designs world's tallest wood building for Paris competition

“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.  

Multifamily Housing | Jun 1, 2015

Sacramento moves forward on multifamily project with new modular supplier

Guerdon Modular Buildings will provide modules for 118 apartments.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021