flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tahanan supportive housing development brings 145 apartments to San Francisco

Multifamily Housing

Tahanan supportive housing development brings 145 apartments to San Francisco

David Baker Architects designed the project.


By David Malone, Associate Editor | February 2, 2021
Tahanan exterior

All renderings courtesy David Baker Architects

A new modular supportive housing development is currently under construction in San Francisco’s central SOMA District.

Tahanan will offer 145 studio apartments (and one manager’s unit) of permanent housing and services for adults who have experienced homelessness. A poured-in-place concrete podium comprises common areas, a counseling suite, administrative offices, and retail space. The upper five floors of wood-frame construction consist of the modular boxes, with each one containing two apartment units and a corridor. The modules were constructed offsite by Factory OS.

 

Tahanan rear

 

The six-story building is being built via modular construction on a site in the central South of Market neighborhood and is part of the SOMA Filipina’s Cultural District, which was established by the S.F. Board of Supervisors and Planning Department to preserve the cultural diversity of the area with attention to highlighting the culture and contributions of the Filipinx American Community.

 

Tahanan facade

 

This culture is referenced in the building’s name and look. Tahanan is a Tagalog word that evokes the idea of “coming home” or “return home,” while the pattern in the cast concrete is made with traditional handwoven banig mats. Additionally, a mega-graphic of Philippine rice terraces is integrated into the exterior metal skin.

A combined enterprise of Mercy Housing, Tipping Point Community, and the San Francisco Housing Accelerator Fund, this project has been developed in collaboration with S.F.’s Department of Homelessness & Supportive Housing. The project has been under construction since October 2020 and is slated for completion in August 2021.

 

Tahanan entrance

 

Tahanan unit

Related Stories

High-rise Construction | Nov 17, 2015

CTBUH awards '2015 Best Tall Building Worldwide' to Bosco Verticale

Designed by Italian architect Stefano Boeri, the building design was applauded for its “extraordinary implementation of vegetation at such scale and height."

Multifamily Housing | Nov 17, 2015

A new luxury high rise reflects a resurgent condo market in Miami Beach

GLASS is one of several residential buildings in the works in that city’s hot South of Fifth neighborhood.

Multifamily Housing | Nov 5, 2015

Architects propose residential tower in Singapore with gardens on every floor

Imagine a high-rise with lush greenery on every floor—that’s the design Ingehoven Architects and A61 propose for Marina One, a series of residential towers in Singapore.

Multifamily Housing | Nov 4, 2015

Labor City: The Qatari complex for 70,000 migrant workers opens

The project is just one of seven house complexes built by the government for the country’s approximately 260,000 labor migrants.

Architects | Oct 27, 2015

Top 10 tile trends for 2016

Supersized tile and 3D walls are among the trending tile design themes seen at Cersaie, an exhibition of ceramic tile and bathroom furnishings held in Bologna, Italy in October.

Multifamily Housing | Oct 27, 2015

Multifamily building in downtown Montreal is being built from the roof down

The method eliminates the need for scaffolding and cranes.

Modular Building | Oct 22, 2015

My Micro NY will soon be New York's first micro-apartment building

The Manhattan modular building will be completed in December and will contain apartments with low rents, but small space.

Architects | Oct 20, 2015

Four building material innovations from the Chicago Architecture Biennial

From lightweight wooden pallets to the largest lengths of CLT-slabs that can be shipped across North America

Multifamily Housing | Oct 20, 2015

Builder confidence rises on multifamily’s strength

Starts and completions were up solidly in September, but permits are leveling off. 

Multifamily Housing | Oct 16, 2015

Textile factory turned multifamily has train tracks running through it

The Counting House Lofts is a 200-year-old building that still has its train tracks, exterior train bay doors, and a watch house tower.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021