flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Mar 1, 2019

U.S. cities have become more dangerous for bicyclists and pedestrians

Reduced speed limits, traffic calming, better education seen as keys to improvement.

Codes and Standards | Feb 28, 2019

High-income renters now the fastest-growing housing market segment

Growth is fastest in mid-sized cities with strong economies.

Codes and Standards | Feb 27, 2019

Katerra launches software platform for ‘entire lifecycle of the building process’

Firm is accepting industry applicants to test the product.

Codes and Standards | Feb 26, 2019

AAMA updates two specifications for test methods related to seismic drift

For evaluating window wall, curtain wall and storefront systems.

Codes and Standards | Feb 21, 2019

Researchers develop software that can calculate potential solar energy yield at any location

Accounts for dynamic shading from trees, buildings and other structures.

Codes and Standards | Feb 20, 2019

Hospitals not making much progress in reducing their carbon footprint

Energy benchmarking survey shows flat emissions pattern over past 20 years.

Codes and Standards | Feb 15, 2019

Super Bowl stadium helps alleviate Atlanta’s flood problems

Capacity to store more than 2 million gallons of storm water on site.

Codes and Standards | Feb 14, 2019

ISO publishes first global BIM standards

Based on British standard and a publicly available standard.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021