flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Mar 19, 2019

Plan for transformation of Lower Manhattan streetscapes unveiled

Pedestrian-friendly “Slow Streets” pilot starts on Earth Day 2019.

Codes and Standards | Mar 15, 2019

Newly developed building materials could have big impact on sustainability

Transparent wood, self-cooling walls, bricks that filter air pollutants among the technological breakthroughs.

Codes and Standards | Mar 14, 2019

U.S. and Canada differ on how to evaluate field performance of windows, curtain walls

Variations include laboratory test method for determining rate of air leakage.

Codes and Standards | Mar 13, 2019

Climate change can’t be stabilized without addressing urban sprawl

Even if power goes green, transportation will still be a major emissions source.

Codes and Standards | Mar 12, 2019

Virginia county hones new rainwater harvesting standard

Developer prompts new rules to use rainwater for heating and air conditioning.

Codes and Standards | Mar 8, 2019

Portland delays requirement for posted warnings on unreinforced brick and stone buildings

Regulation would mandate signs warning that buildings could be unsafe during earthquakes.

Codes and Standards | Mar 7, 2019

California will allow flame retardant-free building insulation

State also repeals business furniture flammability standard.

Codes and Standards | Mar 5, 2019

Persistent flooding having economic impact on coastal cities

Atlantic City, Annapolis among communities affected.

Codes and Standards | Mar 1, 2019

$1 billion Boston hospital project to include extensive disaster resiliency features

Mass. General expansion will be designed for four days of shelter in place.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021