flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Apr 28, 2016

New research finds 30 measures to significantly cut energy use

ASHRAE’s prescription cuts across all building types and climates.  

Codes and Standards | Apr 27, 2016

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.  

Codes and Standards | Apr 25, 2016

San Francisco becomes first big U.S. city to require solar panels on new buildings

Pertains to commercial and residential buildings shorter than 10 stories.  

Codes and Standards | Apr 25, 2016

GSA adopts SITES land development and management rating system

Federal agency will use for properties with and without buildings.  

Wood | Apr 22, 2016

Revised 2015 Manual for Engineered Wood Construction available

American Wood Council Document offers design information for structural applications.

Codes and Standards | Apr 18, 2016

Efficiency finance pilot project to spur retrofits on existing buildings

EDF and PG&E team up on interest-free loans for qualified projects.  

Codes and Standards | Apr 18, 2016

ASHRAE releases proposed energy standard for historic buildings

Designed to balance with preservation requirements.  

Codes and Standards | Apr 13, 2016

Canadian city fines itself for failing to get a building permit for building renovation

Guelph, Ontario, will pay a $1,125 fine to the province.

Codes and Standards | Apr 12, 2016

Construction trade groups sue OSHA over silica rule

Cite concerns about technological and economic feasibility.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021