flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Apr 10, 2017

Congressional hearing on skills gap includes look at construction industry

Strategies to boost ranks of construction workers include mentoring programs, increased safety measures, trade group support, and outreach to school counselors.

Codes and Standards | Apr 6, 2017

Product-specific EPDs seen as key aid to earning green building credits

The product-specific EPDs allow designers to more quickly earn a LEED v4 credit in the Materials & Resources category.

Codes and Standards | Apr 5, 2017

Updated AIA Disaster Assistance Handbook released with significant enhancements

Updates provide guidance on how design and construction pros and emergency managers can work together to prepare for and respond to disasters.

Codes and Standards | Apr 4, 2017

Global standards for indoor environmental monitoring under development

Systems and sensors guidelines will be aligned with major green standards.

Codes and Standards | Apr 3, 2017

New standard test method for static loading and impact on exterior shading released

The method provides a standard lab procedure evaluation of ice and snow loads and impacts.

Codes and Standards | Mar 30, 2017

WELL enters strategic partnership with developer of standards and assessment tools

GIGA’s RESET standard and data collection will be integrated into the WELL standard.

Codes and Standards | Mar 29, 2017

Climate-specific code changes target energy savings for tropical zones

Hawaii considers updated 2015 IECC tailored to its climate.

Codes and Standards | Mar 28, 2017

Safety concerns over wood-frame construction raised after Raleigh apartment fire

The unfinished building was destroyed in a five-alarm blaze.

Codes and Standards | Mar 27, 2017

Bills in Maryland Legislature would restrict use of wood in multifamily construction

American Wood Council and design and construction professionals are speaking out against the measure.

Codes and Standards | Mar 23, 2017

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021