flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Super Bowl stadium helps alleviate Atlanta’s flood problems

Codes and Standards

Super Bowl stadium helps alleviate Atlanta’s flood problems

Capacity to store more than 2 million gallons of storm water on site.


By Peter Fabris, Contributing Editor | February 15, 2019

Courtesy Pixabay

Mercedes-Benz Stadium, site of Super Bowl LIII, was designed to capture enormous amounts of storm water runoff.

Home to the NFL’s Atlanta Falcons and Major League Soccer’s Atlanta United FC, the facility opened in August 2017 as North America’s first LEED platinum stadium. The project accumulated 88 out of a maximum 100 points, the highest LEED rating ever for a sports facility.

The venue has a capacity to store over 2 million gallons of storm water on site. A 680,000-gallon cistern captures rainwater that is used for landscape irrigation and to replenish the site’s cooling tower.

Located within the flood-prone Proctor Creek Watershed, the site includes several bioswales that were created to improve water quality and serve as an alternative to storm sewers.

Related Stories

Codes and Standards | Jan 11, 2021

Zero Energy Buildings growth driven by government policy, stringent codes, technologies

Restraints include high upfront cost, and lack of universal definition and approaches.

Codes and Standards | Jan 11, 2021

HUD releases new Fair Housing Act design and construction requirements

First update of ‘safe harbors’ in 15 years provides better clarity for design and construction firms.

Codes and Standards | Jan 8, 2021

Court ruling gives UpCodes upper hand in fight over building codes database

Battle over IP property claims by ICC and other codes bodies continues.

Codes and Standards | Jan 8, 2021

Houston creates tax incentives for green stormwater elements

Businesses that install green roofs, rain gardens, permeable pavement, and rainwater harvesting are eligible.

Codes and Standards | Jan 7, 2021

Trump’s classical design aesthetic mandate for federal buildings likely to be felt for years

May limit the number of firms that could compete for contracts.

Codes and Standards | Jan 7, 2021

Workers on some of Virginia’s major construction projects sue subcontractors for wage theft

Projects include new General Assembly Building, outpatient facility at Virginia Commonwealth University.

Codes and Standards | Jan 5, 2021

EPA finalizes first major update to Lead and Copper rule

Will accelerate pace of lead service line replacement.

Codes and Standards | Jan 5, 2021

Flood risk for affordable housing expected to triple by 2050

Some communities will have 90% of their affordable housing at risk.

Codes and Standards | Jan 4, 2021

Ranks of remote workers expected to double in five years

Nearly 23% of employees will work from outside of offices.

Codes and Standards | Dec 28, 2020

CSI and ASTM standards can now be connected through a central location

CROSSWALK web service accesses standards specific to projects from feasibility to turnover.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021