flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Super Bowl stadium helps alleviate Atlanta’s flood problems

Codes and Standards

Super Bowl stadium helps alleviate Atlanta’s flood problems

Capacity to store more than 2 million gallons of storm water on site.


By Peter Fabris, Contributing Editor | February 15, 2019

Courtesy Pixabay

Mercedes-Benz Stadium, site of Super Bowl LIII, was designed to capture enormous amounts of storm water runoff.

Home to the NFL’s Atlanta Falcons and Major League Soccer’s Atlanta United FC, the facility opened in August 2017 as North America’s first LEED platinum stadium. The project accumulated 88 out of a maximum 100 points, the highest LEED rating ever for a sports facility.

The venue has a capacity to store over 2 million gallons of storm water on site. A 680,000-gallon cistern captures rainwater that is used for landscape irrigation and to replenish the site’s cooling tower.

Located within the flood-prone Proctor Creek Watershed, the site includes several bioswales that were created to improve water quality and serve as an alternative to storm sewers.

Related Stories

Codes and Standards | Apr 26, 2021

Dozens of companies, organizations call for Congress to double Energy Star funding

Despite broad support, program’s budget has steadily declined in recent years.

Codes and Standards | Apr 22, 2021

Alabama fire chiefs oppose proposal to change school building code oversight

Bill would move code compliance control from state to local boards.

Codes and Standards | Apr 21, 2021

After dry winter, California ramps up wildfire prevention efforts

State to spend half a billion dollars on projects including making buildings more fire resistant.

Codes and Standards | Apr 20, 2021

U.S. electric grid is halfway to zero carbon

Other sectors including buildings lag power industry.

Codes and Standards | Apr 19, 2021

Failed landmark preservation effort in Chicago provides lessons for planners

Gentrification fears heightened among Pilsen neighborhood residents doomed ambitious preservation plan.

Codes and Standards | Apr 14, 2021

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.

Codes and Standards | Apr 13, 2021

British Columbia moves to accelerate mass timber construction

Province funds demonstration projects as part of economic recovery.

Codes and Standards | Apr 12, 2021

WoodWorks and Think Wood release first Mass Timber Design Manual

Interactive collection of information on mass timber products, design best practices, taller wood construction and sustainability.

Codes and Standards | Apr 8, 2021

Sensors used in tunable lighting systems found to have high reliability

DOE study investigated items used to control lumen depreciation, chromaticity shifts, and changes in drivers.

Codes and Standards | Apr 7, 2021

Red tape ruined the U.K.’s home retrofit program

Lessons learned could help US avoid that fate.

boombox1
boombox2
native1

More In Category


Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021