flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summit Design+Build selected at GC for new Office Concepts headquarters

Summit Design+Build selected at GC for new Office Concepts headquarters


By By BD+C Staff | November 14, 2011
Summit Design + Build, LLC has been selected as general contractor for Office Co
Summit Design + Build, LLC has been selected as general contractor for Office Concepts new corporate headquarters facility in Ch

Adam Miller, president of Summit Design + Build, LLC, announced the firm’s selection as general contractor for Office Concepts new 32,000 sf corporate headquarters facility at 1142 North Branch Street on Goose Island in Chicago.

Founded in 1938, Office Concepts provides workplace consultation, planning, procurement, delivery and installation and on-going maintenance to assist customers of all types and sizes with interior furnishing needs.  The company will be vacating its existing Chicago location at 965 W. Chicago Avenue and relocating all Chicago employees but will maintain its other sales and warehouse facility in Lake Forest, Illinois.           

According to Miller, the new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. Completion is scheduled for first quarter 2012. BD+C

Related Stories

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 8, 2012

BD+C wins six B2B journalism awards

BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021