Upon successfully completing Phase One, Suffolk Construction has been selected to manage construction on Phase Two of The Homes at Old Colony redevelopment project in South Boston.
The $50 million project will feature demolition of 223 distressed units and construction of 169 affordable rental units located in four three-story townhouse-style buildings and two four-level elevator buildings.
Suffolk recently joined developer Beacon Communities Development LLC, The Architectural Team, and government officials to celebrate the groundbreaking of Phase Two, which will be completed in May 2014. Prior to the redevelopment, the Old Colony public housing development was the most physically distressed property in the Boston Housing Authority’s portfolio.
As a result, the BHA developed a master plan and successfully applied for and received $44 million in federal funding which allowed the multi-phase redevelopment effort to go forward.
Old Colony’s redevelopment is designed to include extensive green building and energy efficient measures and utilize low impact development strategies. In addition to the LEED Gold certified community building completed in Phase One, each townhome and midrise building is targeting LEED for Homes Platinum and the entire community is designed to achieve LEED certification for Neighborhood Development.
Phase One featured demolition of 164 deteriorated units and construction of 116 new affordable housing units located in a midrise building and four clusters of wood frame townhouses. In addition, Suffolk built a 10,000-sf community center and maintenance garage, and managed improvements to roadways, parking areas, utility infrastructure, and landscaping. +
Related Stories
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.