A new study commissioned by Certain Teed Corp., “Factors Impacting Low-Slope Roofing Costs: A National Labor Study,” compares the amount of labor needed to complete various low-slope roofing project types.
A bituminous roof with a mechanically attached base and self-adhered cap took the fewest labor hours to install. The most labor-intensive roofing type was bituminous with a hot asphalt mopped base and a hot asphalt mopped cap.
The independent, five-year nationwide study found that the type of roof covering, project parameters, tool management, and crew efficiency are all major factors impacting contractor profits. Poorly managed crews, faulty tools and extreme climates will increase installation time, regardless of product selection, the study says.
The study is intended to help roofing contractors optimize allocation of labor from existing crews. It is also a reference contractors can use to compare their labor costs to a current, comprehensive national average.
Related Stories
| Jun 21, 2012
New ISO standard to improve environmental management of concrete
A new ISO standard will help the construction industry better manage the environmental impacts of concrete.
| Jun 21, 2012
On net-zero projects, Building Teams will be held accountable for energy-efficiency performance
The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.
| Jun 14, 2012
USGBC co-founder launches rating system for building product manufacturers
U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.
| Jun 14, 2012
Green standard set for single-ply roofing membrane
A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 14, 2012
Report alleges New York’s prevailing construction wages are miscalculated, costing billions
A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.
| Jun 14, 2012
AGC, other business groups oppose hiring rules for disabled
Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.
| Jun 5, 2012
HP Labs aims for net-zero energy data centers
Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.