flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Study compares labor hours for various low-slope roofing options

Codes and Standards

Study compares labor hours for various low-slope roofing options

Type of roof covering, project parameters, tool management, and crew efficiency all impact profitability.


By Peter Fabris, Contributing Editor | January 2, 2019
Study compares labor hours for various low-slope roofing options

Courtesy CertainTeed Corporation

A new study commissioned by Certain Teed Corp., “Factors Impacting Low-Slope Roofing Costs: A National Labor Study,” compares the amount of labor needed to complete various low-slope roofing project types.

A bituminous roof with a mechanically attached base and self-adhered cap took the fewest labor hours to install. The most labor-intensive roofing type was bituminous with a hot asphalt mopped base and a hot asphalt mopped cap.

The independent, five-year nationwide study found that the type of roof covering, project parameters, tool management, and crew efficiency are all major factors impacting contractor profits. Poorly managed crews, faulty tools and extreme climates will increase installation time, regardless of product selection, the study says.

The study is intended to help roofing contractors optimize allocation of labor from existing crews. It is also a reference contractors can use to compare their labor costs to a current, comprehensive national average.

Related Stories

| Jun 28, 2012

Six buildings now recognized under Living Building Challenge

The Living Building Challenge (LBC), a green ratings system for design and construction that judges a building based on its actual performance, not just its projected performance at the design stage, has recognized six buildings to date.

| Jun 28, 2012

Label for building products will have ‘global warming number’

The director of the 2030 Challenge for Products says that the organization is aiming to place a label on building products that will list what’s in it, and how much embodied carbon each product represents.

| Jun 28, 2012

Top building material executive urges building resilience in sustainability standards

A meeting of 1,000 business executives at the recent Rio+20 environmental conference featured a passionate plea to include building resilience in efforts to boost sustainability.

| Jun 28, 2012

Following spate of skyscraper balcony glass panel breakages, Ontario adopts code change

Ontario's housing minister announced new building code rules to help prevent glass panels from breaking off high-rise balconies during hot weather.

| Jun 28, 2012

Factory worker deaths in Italy raise questions on building codes after earthquakes

Italian officials are questioning seismic building standards and inspection procedures in the aftermath of two damaging earthquakes.

| Jun 21, 2012

Brazilian engineering/construction firm Odebrecht sues Florida over ban on companies doing business in Cuba

Odebrecht Construction Inc., a Brazilian engineering and construction company, is suing the State of Florida over a new law that bans governments from hiring companies with business ties to Cuba.

| Jun 21, 2012

String of shattered glass balcony panels prompts call for code reform in Ontario

Since last summer, glass balconies have shattered at 13 different buildings in Toronto.

| Jun 21, 2012

California adds window film to building code

California is the first state to add window film into its building code. Window film, a polymer material, offers cost-effective energy savings.

boombox1
boombox2
native1

More In Category


Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021