flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled Conference House Park pavilion renovation moving forward

Reconstruction & Renovation

Stalled Conference House Park pavilion renovation moving forward

The pavilion has been awaiting repair since storm damage in 2011 rendered the structure unsafe for the public.


By David Malone, Associate Editor | February 16, 2017

Rendering courtesy of Sage and Coombe

In 2002, the pavilion in Staten Island’s Conference House Park, which is located in an area that makes it very prone to storm damage, was rebuilt as part of a $14 million park renovation project. But not even 10 years later, in 2011, the pavilion was closed due to weather damage to the roof and deck that forced the city to deem the structure unsafe for the public. Almost six full years later, the pavilion is still closed and awaiting repair.

A $3.7 million renovation has been in place for the pavilion, but, as Curbed New York reports, a series of setbacks has kept the project from progressing. The project received funding in 2015, but stalled due to inter-agency conflict. Later, in 2016, construction was also set to begin, but was once again delayed.

However, it appears as though construction on the project will finally get underway this year, as the Department of Parks has issued an invitation for construction bids.

Once completed (if another delay is indeed avoided) the new pavilion will provide 4,200 sf of space and can be used for weddings, concerts, or other public events. Sage and Coombe designed the new pavilion.

Related Stories

Reconstruction & Renovation | Jun 5, 2019

The French Senate doesn’t want your Notre Dame restoration ideas

France’s Prime Minister Édouard Philippe originally wanted to hold an international competition to redesign the cathedral’s roof.

Reconstruction & Renovation | May 22, 2019

Foster + Partners converts historic D.C. library into an Apple store

The building was the city’s first public library.

Reconstruction & Renovation | Apr 5, 2019

Historic Corrigan Tower in Dallas becomes 1900 Pacific Residences

The 18-story Corrigan Tower in the Dallas’s historic downtown district is now a thriving 150-unit apartment residence community.

Reconstruction & Renovation | Mar 27, 2019

Interior restoration of Frank Lloyd Wright’s Frederick C. Robie House completes

The AIA designated the Robie House as one of the 10 most significant structures of the twentieth century.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

Reconstruction & Renovation | Jan 2, 2019

Rebuild or renovate?

With some facilities, a little creativity can save money and salvage a building worth saving. 

University Buildings | Nov 26, 2018

Vacant Dartmouth College building to become faculty and graduate student center

Leers Weinzapfel Associates designed the project.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021