flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Codes and Standards

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.


By Peter Fabris, Contributing Editor | April 24, 2017

PIxabay Public Domain

A new report released by the Center for an Urban Future found significant flaws in how New York City manages capital projects for libraries and cultural institutions.

These projects encounter “staggering delays and exorbitant costs” the report says. The median new library and cultural project takes about seven years to complete and costs $930 per square foot, or roughly twice the cost of building a new office tower in the city, the report says.

The report, a joint project with the Citizens Budget Commission, analyzed 144 capital projects for libraries and cultural organizations completed between fiscal years 2010 and 2014. All were managed by the city’s Department of Design and Construction (DDC).

The report found that even seemingly routine maintenance projects end up taking years. For instance, the median mechanical system upgrade—including replacement and installation of fire alarms, boilers, and heating/cooling systems—took 4.3 years to complete. The study also found that when institutions are granted permission to self-manage capital projects, which is allowed on rare occasions, the projects typically take a fraction of the time and cost roughly 40% less.

Related Stories

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

Codes and Standards | Jan 26, 2021

Updated guide to repair and rehabilitate existing concrete structures published

Document assesses how to adhere to code requirements.

Codes and Standards | Jan 25, 2021

New guide for skylight selection, daylighting design released

Free Fenestration and Glazing Industry Alliance document now available.

Codes and Standards | Jan 20, 2021

Steel industry, labor urge Biden to retain steel tariffs

‘Essential to ensuring the viability of the domestic steel industry.’

Codes and Standards | Jan 19, 2021

2021 Solar Investment Tax Credit will remain at 26%

Incentive was scheduled to be reduced to 22%.

Codes and Standards | Jan 19, 2021

Thomas Jefferson University launches the Institute for Smart and Healthy Cities

Will address climate change, social equity, rapid urbanization, and health.

Codes and Standards | Jan 14, 2021

Petition urges FEMA to update flood maps, set tougher standards for floodplain construction

Environmental and planning groups note soaring claims, flood insurance debt.

Codes and Standards | Jan 13, 2021

Proposed change to IECC process irks efficiency advocates

New procedure would diminish influence of local code officials.

Codes and Standards | Jan 12, 2021

Two net-zero hotel projects could portend a new hospitality trend

Energy-intensive sector comprises 10% of all commercial real estate.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021