flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

St. Edward’s University reveals new Recreation and Athletic Center

University Buildings

St. Edward’s University reveals new Recreation and Athletic Center

Specht Architects designed the building.


By David Malone, Associate Editor | January 27, 2020
Exterior St. Edward's Recreation center at dusk

Credit Andrea Calo.

The recently unveiled Recreation and Athletic Center at St. Edward’s University has been designed with a focus on holistic well-being. 

The 12,400-sf addition to the existing facility, originally built in the mid 1980s, features new fitness and wellness facilities such as a yoga studio, a wellness center, and a meditation center with an openness and connection to the environment that is centered in the middle of the campus.

 

Students doing yoga at St. Edward'sCredit Andrea Calo.

 

The addition wraps the campus-facing side of the facility and is for use by the entire student body and faculty rather than for athletes only. A portion of the building extends out toward the heart of the campus and incorporates outdoor “stadium type” seating facing a new plaza where performance and presentation will take place. The plaza was created where a parking lot once existed and creates a new pedestrian-oriented active space.

 

See Also: Sacred Heart University to build $60 million hockey arena

 

The yoga/studio space is the focal point of the new facility and has been designed as a glass cube that floats above the entry plaza. It is located at one end of the main campus green and provides an inviting new presence at a corner of the campus that was previously dark and under-occupied.

 

Gym SpaceCredit Andrea Calo.

 

Yoga studio interior

 

St Edward's addition exteriorCredit Andrea Calo.

 

St. Edward's podChelsea Purgahn/St. Edward’s University ®.

Related Stories

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

University Buildings | Nov 28, 2017

FXFOWLE and CO Architects collaborate on Columbia University School of Nursing building

The building has a ‘collaboration ribbon’ that runs throughout the building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021