flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Spector Group unveils new law enforcement center for Nassau County

Government Buildings

Spector Group unveils new law enforcement center for Nassau County

The center will serve as a regional training center for all Nassau County Police personnel.


By David Malone, Associate Editor | July 26, 2017
A rendering of the exterior of the new Nassau County Center for Training and Intelligence at dusk

Rendering courtesy of Spector Group

Spector Group recently unveiled the design for the new Nassau County Center for Training and Intelligence for the Nassau County Police Department, which will sit on the grounds of Nassau Community College and overlook the Meadowbrook Parkway.

The overall design of the new facility is meant to create a modern and high-tech environment for training that will remain flexible to cater to the needs of the police force. The facility will have a balance of hands-on-training structures and academic classrooms. Each classroom will have the ability to be sectioned and split into smaller classrooms. Oversized doors are incorporated throughout the building to allow for vehicular access and stage setting in the tactical zones.

 

A rendering of an interior room with computers and a video wall at the Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

 

The exterior of the building incorporates a façade that features a combination of white panels and windows. Large slabs of pre-cast concrete form the Nassau County Police Department shield and the letters “NCPD.” The shield and letters are highly visible and will be lit up at night.

 

A rendering of the exterior of the Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

 

Among the center’s many training facilities are:

  • A new police training academy for cadets and in-service officers
  • Academic fitness areas
  • An auditorium and lecture hall facilities
  • An intelligence bureau
  • Emergency vehicle operations course (EVOC)
  • An indoor/outdoor tactical training “village” that allows for simulation and scenario-based training

 

A rendering of an auditorium at the Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

 

“This design is versatile and all elements can be utilized for training, as well as for other purposes,” says Marc B. Spector AIA, Principal, Spector Group.

The Nassau County Center for Training and Intelligence will serve police personnel from all 19 village and city departments located throughout Nassau Country, as well as a wide array of state and federal law enforcement agencies.

 

A rendering of one of the entryways at Spector Groups Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

Related Stories

Sponsored | | Sep 23, 2013

Nichiha USA panels provide cost savings for community project

When tasked with the design and development of a newly constructed Gateway Rehabilitation Center, architects at Rothschild Doyno Collaborative first designed the new center to include metal panels. When the numbers came back, they were challenged with finding a product that would help cut costs and keep them within the construction budget. Nichiha’s fiber cement panels come in a half or less of the metal panel cost.

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 19, 2013

Roof renovation tips: Making the choice between overlayment and tear-off

When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.

| Sep 17, 2013

Complex stained glass restoration under way on Wisconsin Capitol Building

Work is under way at the Wisconsin State Capitol on an extensive $2.7 million, 14-month renovation to the skylights above the House and Senate chambers, along with the barrel vault skyline above the grand staircase and the panels in the rotunda dome.

| Sep 16, 2013

Study analyzes effectiveness of reflective ceilings

Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

The new medical office building: 7 things to know about today’s outpatient clinic

Regulatory pressures, economic constraints, and emerging technologies are transforming healthcare. Learn how Building Teams are responding with efficient, appealing, boundary-blurring outpatient buildings. 

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

boombox1
boombox2
native1

More In Category



Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021