flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Spector Group unveils new law enforcement center for Nassau County

Government Buildings

Spector Group unveils new law enforcement center for Nassau County

The center will serve as a regional training center for all Nassau County Police personnel.


By David Malone, Associate Editor | July 26, 2017
A rendering of the exterior of the new Nassau County Center for Training and Intelligence at dusk

Rendering courtesy of Spector Group

Spector Group recently unveiled the design for the new Nassau County Center for Training and Intelligence for the Nassau County Police Department, which will sit on the grounds of Nassau Community College and overlook the Meadowbrook Parkway.

The overall design of the new facility is meant to create a modern and high-tech environment for training that will remain flexible to cater to the needs of the police force. The facility will have a balance of hands-on-training structures and academic classrooms. Each classroom will have the ability to be sectioned and split into smaller classrooms. Oversized doors are incorporated throughout the building to allow for vehicular access and stage setting in the tactical zones.

 

A rendering of an interior room with computers and a video wall at the Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

 

The exterior of the building incorporates a façade that features a combination of white panels and windows. Large slabs of pre-cast concrete form the Nassau County Police Department shield and the letters “NCPD.” The shield and letters are highly visible and will be lit up at night.

 

A rendering of the exterior of the Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

 

Among the center’s many training facilities are:

  • A new police training academy for cadets and in-service officers
  • Academic fitness areas
  • An auditorium and lecture hall facilities
  • An intelligence bureau
  • Emergency vehicle operations course (EVOC)
  • An indoor/outdoor tactical training “village” that allows for simulation and scenario-based training

 

A rendering of an auditorium at the Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

 

“This design is versatile and all elements can be utilized for training, as well as for other purposes,” says Marc B. Spector AIA, Principal, Spector Group.

The Nassau County Center for Training and Intelligence will serve police personnel from all 19 village and city departments located throughout Nassau Country, as well as a wide array of state and federal law enforcement agencies.

 

A rendering of one of the entryways at Spector Groups Nassau County Center for Training and IntelligenceRendering courtesy of Spector Group.

Related Stories

| Dec 20, 2013

Can energy hogs still be considered efficient buildings? Yes, say engineers at Buro Happold

A new tool from the engineering firm Buro Happold takes into account both energy and economic performance of buildings for a true measure of efficiency. 

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 9, 2013

Skaneateles, N.Y., converts old firehouse to net-zero village hall

The Finger Lakes village of Skaneateles, N.Y., renovated its vacant firehouse into Skaneateles Village Hall, the first municipal net-zero energy building in the state of New York.

| Dec 4, 2013

First look: Dubai's winning bid for World Expo 2020 [slideshow]

Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.

| Dec 3, 2013

Architects urge government to reform design-build contracting process

Current federal contracting laws are discouraging talented architects from competing for federal contracts, depriving government and, by inference, taxpayers of the best design expertise available, according to AIA testimony presented today on Capitol Hill.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 27, 2013

LEED for Healthcare offers new paths to green

LEED for Healthcare debuted in spring 2011, and certifications are now beginning to roll in. They include the new Puyallup (Wash.) Medical Center and the W.H. and Elaine McCarty South Tower at Dell Children’s Medical Center of Central Texas in Austin.

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

boombox1
boombox2
native1

More In Category



Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021