In Guangzhou, China, Skidmore, Owings & Merrill (SOM) has designed the recently completed Star River Headquarters to minimize embodied carbon, reduce energy consumption, and create a healthy work environment. The 48-story tower is located in the business district on Guangzhou’s Pazhou Island.
The tower’s pleated façade ascends in a parabolic taper, which reduces wind loads while creating vertical planes of light and shadow. This design provides shading to reduce direct sunlight while at the same time allowing diffuse daylight to enter the interior spaces. In addition, the envelope’s high-performance curtain wall systems and thermal insulation reduce cooling loads and improve indoor comfort.
Building design features rounded corners, open floor plates
Individual bays formed by the pleats can accommodate both open and closed offices on the building’s perimeter. The building’s rounded corners are free of columns, creating open floor plates with views of the Pearl River.
Mullions that run the entire building height of 259.5 meters (851 feet) integrate operable panels, so occupants have direct access to fresh air. The building’s crown features a latticed structure containing a greenhouse with heritage plants and a pavilion with a reflecting pool.
The building is located on a public plaza with native landscaping and paved areas around the glass-enclosed lobby. The building’s canopy wraps around the base and extends above a retail building, forming a covered pedestrian arcade. This design also conceals the mechanical spaces on the block’s edge. Visitors can access the retail offerings and subway connection below grade.
The building management system includes environmental control standards, plant monitoring, and a user interface that allows for efficient operations.
On the Building Team:
Owner/developer: Guangzhou Star River Commercial Investment And Development Co, Ltd.
Design architect: Skidmore, Owings & Merrill (SOM)
Architect of record: Guangzhou Design Institution
MEP engineer and structural engineer: SOM
General contractor: Zhongtian Construction Group Co., Ltd.
Interior design: ChengChung + Design
Lighting design: Leox Design Partnership|
Façade consultant: Shanghai PFT Construction Consulting Co.
![Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-1_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-2_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-3_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-7_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-8-fix_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-12_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-13_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-14_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-15_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-16_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-17_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-18_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-20_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-22_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-23_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-25_large.jpg)
![Star River Headquarters, designed by SOM. Photo by Seth Powers, courtesy SOM](/sites/default/files/inline-images/Pazhou%20Star%20River-final-tiff-27_large.jpg)
Related Stories
MFPRO+ Special Reports | Jan 4, 2024
Top 10 trends in multifamily rental housing
Demographic and economic shifts, along with work and lifestyle changes, have made apartment living preferable for a wider range of buyers and renters. These top 10 trends in multifamily housing come from BD+C's 2023 Multifamily Annual Report.
Green | Dec 18, 2023
Class B commercial properties gain more from LEED certification than Class A buildings
Class B office properties that are LEED certified command a greater relative benefit than LEED-certified Class A buildings, according to analysis from CBRE. The Class B LEED rent advantage over non-LEED is about three times larger than the premium earned by Class A LEED buildings.
Office Buildings | Dec 12, 2023
Transforming workplaces for employee mental health
Lauren Elliott, Director of Interior Design, Design Collaborative, shares practical tips and strategies for workplace renovation that prioritizes employee mental health.
Office Buildings | Dec 11, 2023
Believe it or not, there could be a shortage of office space in the years ahead
With work-from-home firmly established, many real estate analysts predict a dramatic reduction in office space leasing and plummeting property values. But the high-end of the office segment might actually be headed for a shortage, according to real estate intelligence company CoStar Group.
Transit Facilities | Dec 4, 2023
6 guideposts for cities to create equitable transit-oriented developments
Austin, Texas, has developed an ETOD Policy Toolkit Study to make transit-oriented developments more equitable for current and future residents and businesses.
Office Buildings | Dec 1, 2023
Amazon office building doubles as emergency housing for Seattle families
The unusual location for services of this kind serves over 300 people per day. Mary's Place spreads across eight of the office's floors—all designed by Graphite—testing the status quo for its experimental approach to homelessness support.
Engineers | Nov 27, 2023
Kimley-Horn eliminates the guesswork of electric vehicle charger site selection
Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. Kimley-Horn, the national engineering, planning, and design consulting firm, today launched TREDLite EV, a cloud-based tool that helps organizations develop and optimize their EV charger deployment strategies based on the organization’s unique priorities.
Market Data | Nov 27, 2023
Number of employees returning to the office varies significantly by city
While the return-to-the-office trend is felt across the country, the percentage of employees moving back to their offices varies significantly according to geography, according to Eptura’s Q3 Workplace Index.
Office Buildings | Nov 10, 2023
3 important early considerations for office-to-residential conversions
Scott Campagna, PE, Senior Director of Housing, IMEG Corp, shares insights from experts on office-to-residential conversion issues that may be mitigated when dealt with early.
Laboratories | Nov 8, 2023
Boston’s FORUM building to support cutting-edge life sciences research and development
Global real estate companies Lendlease and Ivanhoé Cambridge recently announced the topping-out of FORUM, a nine-story, 350,000-sf life science building in Boston. Located in Boston Landing, a 15-acre mixed-use community, the $545 million project will achieve operational net zero carbon upon completion in 2024.