When the Sochi Winter Olympics kick off next month (Feb. 7-23) in Russia, the temporary pavilion for Russian telecom operator MegaFon is going to turn a lot of heads—literally.
The company commissioned London-based designer Asif Khan to create a one-of-a-kind installation for the Games. Khan answered with MegaFaces, a 39-foot-high, illuminated façade that acts much like a giant pin screen, replicating the faces of people in the crowd in the form of a 26-foot-high, 3D mural.
The kinetic façade will display three faces simultaneously, and each participant will receive a 20-second video clip of their experience via email.
Here's how it works, according to a report by Dezeen: People step into a 3D photo booth to have their face scanned from five different angles.
Using the data, a computer creates a 3D model of the facial structure (in about a minute) and sends the coordinates to an engine-and-cable system that controls a series of actuators that make up the kinetic portion of the façade. Each one of the 10,000 actuators can extend out to lengths of six feet, allowing for the creation of dramatic, 3D murals.
Don't believe us? See for yourself:
Related Stories
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 10, 2013
Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule
When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.
| Jun 7, 2013
Must see: Building façade made of massive concrete drain pipes
Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.
| Jun 7, 2013
40 Under 40 retrospective: Where are they now?
Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.