Despite the lingering effects of an over-built housing market, the continued difficulty to obtain financing for real estate projects, budget shortfalls at state and municipal governments and the anxiety surrounding the prolonged European debt crisis, there are signs that the U.S. design and construction industry will be improving.
Corporate profits have returned to pre-recession levels and businesses have subsequently been increasing their capital spending, borrowing costs are at record low levels and pent up demand for commercial and retail projects factors into what projects to be a 2.1% rise in spending this year for nonresidential construction projects.
The American Institute of Architects (AIA) semi-annual Consensus Construction Forecast, a survey of the nation’s leading construction forecasters, also projects a 6.4% increase of spending in 2013.
“Spending on hotels, industrial plants and commercial properties are going to set the pace for the construction industry over the next two years,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “The institutional market won’t experience the same growth, but healthcare facilities and places of worship are poised for a positive economic outlook in that sector.”
Market Segment Consensus Growth Forecasts |
2012 |
2013 |
Overall nonresidential |
2.1% |
6.4% |
Commercial / industrial |
5.6% |
11.4% |
Hotels |
10.2% |
19.7% |
Industrial |
6.0% |
10.2% |
Retail |
5.0% |
9.9% |
Office buildings |
4.3% |
9.6% |
Institutional |
-0.1% |
3.6% |
Religious |
5.1% |
6.3% |
Healthcare facilities |
4.5% |
5.3% |
Amusement / recreation |
0.2% |
6.5% |
Education |
-1.7% |
3.1% |
Public safety |
-3.8% |
0.3% |
Remarking on what could derail a positive turnaround, Baker added, “We are concerned that the unusually high energy costs, given the overall weakness in the economy, might trigger a jolt in inflation and hamstring economic recovery. The housing market also needs prices to stabilize and to resolve the high number of delinquencies and foreclosures before it can fully recover.” BD+C
Related Stories
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.