Despite the lingering effects of an over-built housing market, the continued difficulty to obtain financing for real estate projects, budget shortfalls at state and municipal governments and the anxiety surrounding the prolonged European debt crisis, there are signs that the U.S. design and construction industry will be improving.
Corporate profits have returned to pre-recession levels and businesses have subsequently been increasing their capital spending, borrowing costs are at record low levels and pent up demand for commercial and retail projects factors into what projects to be a 2.1% rise in spending this year for nonresidential construction projects.
The American Institute of Architects (AIA) semi-annual Consensus Construction Forecast, a survey of the nation’s leading construction forecasters, also projects a 6.4% increase of spending in 2013.
“Spending on hotels, industrial plants and commercial properties are going to set the pace for the construction industry over the next two years,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “The institutional market won’t experience the same growth, but healthcare facilities and places of worship are poised for a positive economic outlook in that sector.”
Market Segment Consensus Growth Forecasts |
2012 |
2013 |
Overall nonresidential |
2.1% |
6.4% |
Commercial / industrial |
5.6% |
11.4% |
Hotels |
10.2% |
19.7% |
Industrial |
6.0% |
10.2% |
Retail |
5.0% |
9.9% |
Office buildings |
4.3% |
9.6% |
Institutional |
-0.1% |
3.6% |
Religious |
5.1% |
6.3% |
Healthcare facilities |
4.5% |
5.3% |
Amusement / recreation |
0.2% |
6.5% |
Education |
-1.7% |
3.1% |
Public safety |
-3.8% |
0.3% |
Remarking on what could derail a positive turnaround, Baker added, “We are concerned that the unusually high energy costs, given the overall weakness in the economy, might trigger a jolt in inflation and hamstring economic recovery. The housing market also needs prices to stabilize and to resolve the high number of delinquencies and foreclosures before it can fully recover.” BD+C
Related Stories
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Tower commemorates Lewis & Clark’s historic expedition
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.
| Oct 13, 2010
Maryland replacement hospital expands care, changes name
The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.
| Oct 13, 2010
Campus building gives students a taste of the business world
William R. Hough Hall is the new home of the Warrington College of Business Administration at the University of Florida in Gainesville. The $17.6 million, 70,000-sf building gives students access to the latest technology, including a lab that simulates the stock exchange.
| Oct 13, 2010
Science building supports enrollment increases
The new Kluge-Moses Science Building at Piedmont Virginia Community College, in Charlottesville, is part of a campus update designed and managed by the Lukmire Partnership. The 34,000-sf building is designed to be both a focal point of the college and a recruitment mechanism to get more students enrolling in healthcare programs.
| Oct 13, 2010
Cancer hospital plans fifth treatment center
Construction is set to start in December on the new Cancer Treatment Centers of America’s $55 million hospital in Newnan, Ga. The 225,000-sf facility will have 25 universal inpatient beds, two linear accelerator vaults, an HDR/Brachy therapy vault, and a radiology and imaging unit.
| Oct 13, 2010
Apartment complex will offer affordable green housing
Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.