flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Codes and Standards

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Will use the Embodied Carbon in Construction Calculator it helped create.


By Peter Fabris, Contributing Editor | November 17, 2021
CO2

Courtesy Pixabay

Skanska USA Building will provide initial embodied carbon assessments on every new construction project it works on greater than 5,000m3 (53,000 sf).

The company will use the Embodied Carbon in Construction Calculator (EC3), a product it co-created with industry partners. Skanska USA Building has been piloting EC3 in partnership with Skanska Commercial Development in the U.S. since 2019.

“The data and tools provided by Skanska’s evaluations provide customers with actionable information to make significant and lasting choices about reducing carbon on their projects,” said Paul Hewins, president & CEO, Skanska USA Building. “Customers have the power to positively affect the supply chain if they choose to invest in full or partial materials tracking and reporting.”

Use of the EC3 tool over the last two years has shown that a 30% reduction in embodied carbon is typically achievable for little or no cost, Skanska says. Skanska recently partnered with the Rocky Mountain Institute on a study that produced similar results.

EC3 is available free and open source at www.buildingtransparency.org.

Related Stories

| Mar 5, 2014

San Francisco board seeks remedies to code enforcement complaints

Two supervisors charged that a lack of adequate code enforcement has led to blight from dilapidated or unfinished buildings. 

| Mar 5, 2014

Obama proposes $1 billion for climate change risk mitigation

President Barack Obama would spend $1 billion to “better understand the projected impacts of climate change,” encourage local action to reduce future risk, and fund technology and infrastructure that will be more resilient to climate change.

| Mar 5, 2014

Southern Forest Products Assn. revamps pressure-treated pine specifications

It provides information to assist with the proper specification and use of pressure-treated Southern Pine materials. 

| Mar 5, 2014

UL, PRI Construction Materials Technologies reach product certification agreement

Underwriters Laboratories (UL) Inc. reached an agreement with PRI Construction Materials Technologies LLC (PRI) through which PRI will participate in UL's "Data Acceptance Program," enabling the acceptance of data generated at PRI toward UL product certification.

| Mar 5, 2014

Quebec's building code doesn't meet needs of its aging population

The issue was raised in the wake of a tragic fire at a seniors' residence in L'Isle-Verte. 

| Mar 4, 2014

Massachusetts Congressional delegation asks FEMA to slow flood zone map requirements

After a recent successful challenge of the scientific methodology used to redraw the coastal high-hazard zones, the Massachusetts congressional delegation is asking federal officials to put the brakes on new flood zone maps for the Bay State.

| Mar 3, 2014

Injury-liability law responsible for higher construction insurance cost in New York

Construction contractors and developers in New York state face $3 billion more in costs and 667 more accidents per year because of a state law that holds builders solely liable for such accidents, according to a study commissioned by the New York Civil Justice Institute.

| Feb 28, 2014

GBI issues guide to help federal agencies meet sustainability mandates

The Green Building Initiative has released “The Guiding Principles Compliance for New Construction,” for federal buildings to help federal agencies meet sustainability mandates in the construction of new buildings.

| Feb 28, 2014

Steel Joist Institute standards open for review

The 2015 draft of the Steel Joist Institute’s “Single Joist Standard Specification for K-, LH-, and DLH-Series and Joist Girders” will be available for public review until May 31, 2014.

| Feb 28, 2014

Metcalf Construction wins key reversal from federal appeals court in Hawaii on military contract

Metcalf spent more than $76 million on a military construction project and sued to recoup costs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021