flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Codes and Standards

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Will use the Embodied Carbon in Construction Calculator it helped create.


By Peter Fabris, Contributing Editor | November 17, 2021
CO2

Courtesy Pixabay

Skanska USA Building will provide initial embodied carbon assessments on every new construction project it works on greater than 5,000m3 (53,000 sf).

The company will use the Embodied Carbon in Construction Calculator (EC3), a product it co-created with industry partners. Skanska USA Building has been piloting EC3 in partnership with Skanska Commercial Development in the U.S. since 2019.

“The data and tools provided by Skanska’s evaluations provide customers with actionable information to make significant and lasting choices about reducing carbon on their projects,” said Paul Hewins, president & CEO, Skanska USA Building. “Customers have the power to positively affect the supply chain if they choose to invest in full or partial materials tracking and reporting.”

Use of the EC3 tool over the last two years has shown that a 30% reduction in embodied carbon is typically achievable for little or no cost, Skanska says. Skanska recently partnered with the Rocky Mountain Institute on a study that produced similar results.

EC3 is available free and open source at www.buildingtransparency.org.

Related Stories

| May 19, 2014

Construction skilled-worker shortage causing rise in claims

The improved economy has boosted construction starts, but a shortage of experienced trade workers has led to more on-the-job injuries and construction defects.

| May 15, 2014

AISC Prequalified Seismic Moment Connection standard update now available

The AISC standard Prequalified Moment Connections for Special and Intermediate Steel Moment Frames for Seismic Applications (ANSI/AISC 358-10) has been updated with a second supplement, ANSI/AISC 358s2-14.

| May 15, 2014

ConsensusDocs releases new agreements for contractors who hire consultants

ConsensusDocs has released the new ConsensusDocs 746 Constructor & Geotechnical Consultant Agreement and the 747 Constructor & Consultant Agreement.

| May 8, 2014

Report: Top storm-resilient cities have high adaptive capacity

The most resilient cities in the world, including five in the U.S., have attributes that would enable them to recover better than others from devastating natural disasters.

| May 8, 2014

LED lighting helps cities receive Energy Star designation

Thanks largely to an ambitious program to boost the use of LED lighting in its buildings, Los Angeles is the top ranked U.S. city on the Environmental Protection Agency’s annual list of U.S. cities that are doing the most to improve energy efficiency.

| May 8, 2014

Door knob code revisions generating controversy

The City of Vancouver’s ban on doorknobs in all new buildings, which went into effect last month, has drawn a strong reaction from the public and heated debate across Canada as other jurisdictions consider the measure.

| May 8, 2014

Structural concrete code revisions open for public comments

The American Concrete Institute’s completely reorganized ACI 318-14, “Building Code Requirements for Structural Concrete and Commentary,” is open for public review for a 45-day period.

| May 3, 2014

Controversy rages over cost, benefits of proposed OSHA silica dust rule

Introduced in August 2013, the proposal would lower allowable levels of crystalline silica in all workplaces, standardize how the dust is calculated, and require medical monitoring for employees exposed to high levels.

| May 3, 2014

California’s Title 24 promises to reshape the construction industry

California’s recent revisions to Title 24 contain ambitious performance goals: all residential buildings must be Zero Net Energy by 2020 and commercial buildings must reach that standard by 2030.

| Apr 30, 2014

House Appropriations Committee approves $3 billion cut for military construction

The Army would see the sharpest cuts on a percentage basis, with a $578 million, or 52% reduction in FY 2015.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021