Skanska USA’s Civil Construction business unit announced the promotion of Mike Aparicio to executive vice president for its western region and the hiring of Mark Leintz as vice president of operations.
Aparicio has been leading Skanska USA Civil’s activities in Los Angeles and will now oversee its entire west coast operations, which includes Los Angeles and Riverside, Calif. and Seattle, Wash.
Aparicio is a third-generation California contractor based in Skanska’s L.A. office. For more than 30 years, he has led some of the largest design-build projects in the west, including the $1 billion Los Angeles Metro Gold Line Projects, and, since joining Skanska, the $575 million Expo Line Phase 2 project. He attended Loyola-Marymount University and Linfield College.
Additionally, Skanska hired Mark Leintz as vice president of operations. Leintz has nearly 30 years of experience in the industry, most recently leading Granite’s large projects group in the west. Starting out as a field engineer, Mark has built his career to oversee work in California, Colorado, Texas, and Florida. Leintz will be based in Skanska’s Los Angeles office, reporting to Aparicio, and will play a key part in Skanska’s pursuit of projects utilizing design-build and other alternative delivery methods. Leintz has a degree in civil engineering from the Colorado School of Mines. BD+C
Related Stories
| Aug 11, 2010
Outdated office tower becomes Nashville’s newest boutique hotel
A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.
| Aug 11, 2010
HDR, Perkins+Will top BD+C's ranking of the nation's 100 largest healthcare design firms
A ranking of the Top 100 Healthcare Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Steel Joist Institute announces 2009 Design Awards
The Steel Joist Institute is now accepting entries for its 2009 Design Awards. The winning entries will be announced in November 2009 and the company with the winning project in each category will be awarded a $2,000 scholarship in its name to a school of its choice for an engineering student.
| Aug 11, 2010
29 Great Solutions for the AEC Industry
AEC firms are hotbeds of invention and innovation to meet client needs in today's highly competitive environment. The editors of Building Design+Construction are pleased to present 29 "Great Solutions" to some of the most complex problems and issues facing Building Teams today. Our solutions cover eight key areas: Design, BIM + IT, Collaboration, Healthcare, Products, Technology, Business Management, and Green Building.
| Aug 11, 2010
Permanent tribute to Daniel Burnham and his Plan of Chicago proposed for Grant Park Museum Campus
The first-place winner of a design competition for a public memorial celebrating Daniel Burnham's impact on Chicago will be announced at a news conference Wednesday, July 8, at 10am CDT. The proposed site for the memorial is on the Museum Campus just north of The Field Museum. The announcement comes after nearly two years of planning by Chicago's architecture, design and urban planning community about how to best honor the legacy of Burnham and the Plan of Chicago he co-wrote with Edward Bennett.
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Architecture billings index takes turn for the worse
After showing signs of stabilization over the last three months, the Architecture Billings Index (ABI) plunged nearly five points in June. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the June ABI rating was 37.7, far lower than the 42.9 the previous month.