flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Six-story structure combines a parking garage with street-level retail

Mixed-Use

Six-story structure combines a parking garage with street-level retail

Eskew+Dumez+Ripple designed the structure.


By David Malone, Associate Editor | September 14, 2018
The Park at dusk

Photo: Timothy Hursley

A new six-story hybrid structure in New Orleans combines a 441-space parking garage with 27,000-sf of street-level retail. Dubbed The Park, the 205,000-sf structure integrates large, pre-manufactured modules to create an aesthetic similar to the 19th century warehouses prevalent in the city’s Warehouse District.

The garage meets the 50% open-air façade requirements for naturally ventilated parking structures and is composed of various widths of solid concrete and open-air gaps to eschew the heavy grid of most garages. The parking garage’s design uses three pre-cast, integrally-colored modules – parapet panels, structural beams, and exterior panels – with five variations for each. The pre-cast panels on the two primary street facades vary in size from 34 feet 10 inches in length to 41 feet in length, and are smooth with strategically placed reveals for an added layer of detail.

 

The Park garage and retailPhoto: Timothy Hursley.

See Also: Helsinki’s underground art museum opens to the public

 

The main entrance at the street level switches from the industrial concrete of the arcade and marquee to a natural hardwood screen that aligns with the entry. Steel awnings along Girod Street provide retailers and pedestrians relief from the sun and rain.

Eskew+Dumez+Ripple designed the structure.

 

The Park's main entrancePhoto: Timothy Hursley.

Related Stories

Mixed-Use | Aug 3, 2017

A sustainable mixed-use development springs from a Dutch city center like a green-fringed crystal formation

MVRDV and SDK Vastgoed won a competition to redevelop the inner city area around Deken van Someren Street in Eindhoven.

Mixed-Use | Aug 2, 2017

Redevelopment of Newark’s Bears Stadium site receives team of architects

Lotus Equity Group selected Michael Green Architecture, TEN Aquitectos, Practice for Architecture and Urbanism, and Minno & Wasko Architects and Planners to work on the project.

Retail Centers | Jul 20, 2017

L.A.’s Promenade at Howard Hughes Center receives a new name and a $30 million cash injection

Laurus Corporation and The Jerde Partnership will team up to rebrand the center as a family-friendly dining and entertainment destination.

Office Buildings | Jul 12, 2017

CetraRuddy unveils seven-story office building design for Staten Island’s Corporate Park

Corporate Commons Three is expected to break ground later this summer.

Mixed-Use | Jul 7, 2017

ZHA’s Mandarin Oriental hotel and residences employs ‘stacked vases’ design approach

The mixed-use tower will rise 185 meters and be located in Melbourne's Central Business District.

Office Buildings | Jun 27, 2017

Bloomberg’s European headquarters wants to become a natural extension of London

Foster + Partners’ design rises 10 stories and is composed of two connected buildings.

Multifamily Housing | May 25, 2017

Luxury residential tower is newest planned addition to The Star in Frisco

The building will be within walking distance to the Dallas Cowboys World Headquarters.

Mixed-Use | May 24, 2017

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

The 36,000-sm project will cover a city block and include a residential tower.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

Mixed-Use | May 17, 2017

The Lincoln Common development has begun construction in Chicago’s Lincoln Park

The mixed-use project will provide new apartments, condos, a senior living facility, and retail space.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021