After seeing a 200% increase in budget, number of students served, and annual visitors in recent years, the Aspen Art Museum deserved a makeover. After 18 months of planning and construction, the museum will finally open its new Shigeru Ban-designed facility to the public on August 9.
The Japanese architect and 2014 Pritzker Architecture Prize winner is known for using lightweight materials, true to the traditional construction requirements in his earthquake-prone homeland. Ban also has a knack for elevating disaster relief with style and simplicity. The new Aspen Art Museum is no outcast in his portfolio of simple, crisp structures.
Located in the heart of downtown Aspen, with a 360-view of the mountainous landscape, the Aspen Art Museum is a cube structure sheathed on two sides with a distinctive woven-wood screen, Architecture Lab reports.
Not only does the museum now have triple the amount of exhibition space at 17,500 sf, the rooftop also has a sculpture garden that makes use of the beautiful view of the Rockies.
Related Stories
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.
| Mar 14, 2012
Hyatt joins Thornton Tomasetti as VP in Chicago
A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.