After seeing a 200% increase in budget, number of students served, and annual visitors in recent years, the Aspen Art Museum deserved a makeover. After 18 months of planning and construction, the museum will finally open its new Shigeru Ban-designed facility to the public on August 9.
The Japanese architect and 2014 Pritzker Architecture Prize winner is known for using lightweight materials, true to the traditional construction requirements in his earthquake-prone homeland. Ban also has a knack for elevating disaster relief with style and simplicity. The new Aspen Art Museum is no outcast in his portfolio of simple, crisp structures.
Located in the heart of downtown Aspen, with a 360-view of the mountainous landscape, the Aspen Art Museum is a cube structure sheathed on two sides with a distinctive woven-wood screen, Architecture Lab reports.
Not only does the museum now have triple the amount of exhibition space at 17,500 sf, the rooftop also has a sculpture garden that makes use of the beautiful view of the Rockies.
Related Stories
| Mar 19, 2012
Smith Carter joins forces with Genivar
Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.