flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Shenzhen projects halted as Chinese officials find substandard concrete

Shenzhen projects halted as Chinese officials find substandard concrete

Projects affected by the shutdown include Ping'an Finance Center, set to become China's tallest building.


By BD+C Staff | March 29, 2013

State inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand. Thirty-one companies have been cited for violations, and eight were ordered to suspend business for a year. Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted during the inspection. (Only 80 meters of the Ping'an building has been erected so far; China Construction First Building Group Corp. Ltd. is the primary contractor.)

Unprocessed sea sand is illegal to use as an aggregate in concrete because its chlorine and salt content are corrosive to steel, causing buildings to degrade and potentially collapse within a few decades. River sand, the preferred material, costs twice as much and is in short supply.

The scandal is currently confined to Shenzhen but could spread to other cities given the obvious financial incentives for using sea sand. Inspectors also found that two large sand pits were using seawater instead of fresh water to rinse sand, also a problematic practice. 

Industry experts express particular concern because China currently has nine of the putative 20 tallest buildings in the world currently under construction, as well as many other skyscrapers. 

(http://www.scmp.com/news/china/article/1191896/shenzhen-construction-hold-after-alert-over-cheap-sand-concrete)

Related Stories

| Nov 25, 2013

Electronic plan review: Coming soon to a city near you?

With all the effort AEC professionals put into leveraging technology to communicate digitally on projects, it is a shame that there is often one major road block that becomes the paper in their otherwise “paperless” project: the local city planning and permitting department. 

| Nov 22, 2013

Kieran Timberlake, PE International develop BIM tool for green building life cycle assessment

Kieran Timberlake and PE International have developed Tally, an analysis tool to help BIM users keep better score of their projects’ complete environmental footprints.

| Nov 20, 2013

Architecture Billings Index slows in October; project inquiries stay strong

Following three months of accelerating demand for design services, the Architecture Billings Index reflected a somewhat slower pace of growth in October. The October ABI score was 51.6, down from a mark of 54.3 in September.

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

| Nov 18, 2013

Lord Aeck Sargent opens metro D.C. office, updates brand

Architecture, design, and planning firm unveils its sixth office, plus a new visual identity system and website

| Nov 18, 2013

How do construction professionals use social media?

LinkedIn is the social network used by most construction professionals, according to the results of a newly released national survey conducted by the Construction Marketing Association. 

| Nov 17, 2013

How to spend your first 15 minutes with a prospect

Every business development person has been there. You’ve finally earned a few minutes to impress a prospect that you’ve been pursuing. This is your opportunity to shine. What do you say?

| Nov 17, 2013

Meet up with the BD+C team at Greenbuild. Drinks are on us!

To all our friends in the AEC industry, you are cordially invited to join the BD+C team at several fun events during the Greenbuild show this week. No RSVP required. Just show up and enjoy. 

| Nov 15, 2013

Halls of ivy keep getting greener and greener

Academic institutions have been testing the limits of energy-conserving technologies, devising new ways to pay for sustainability extras, and extending sustainability to the whole campus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021