flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A series of green bridges will connect these two towers in Shenzhen, China

Mixed-Use

A series of green bridges will connect these two towers in Shenzhen, China

Steven Holl Architects designed the project.


By David Malone, Associate Editor | May 2, 2019

All renderings courtesy Steven Holl Architects

Steven Holl Architects will design the new headquarters for iCarbonX, a genome machine intelligence company, in Shenzhen, China after winning the project’s design competition. The buildings are inspired by the study of genes and DNA with the two towers connected by four green bridges that draw their inspiration from carbon bonds.

The first tower, Body A, will be a residential tower, while the second Tower, Body B, will house offices, labs, and public reception spaces. The towers will also comprise a sky lounge, a gym, a restaurant, a sky atrium, a health club, lecture and exhibition space, dining space, and a business club.

 

 

Two green bridges will connect the towers at the top at a health and nutrition circuit with cafes, a gym, and a swimming pool. The lower two bridges connect to form public outreach spaces, a clinic (which anchors the Living and Working towers), galleries, and meeting spaces. All four bridges will be filled with native tropical plants.

 

See Also: Yeti’s new global headquarters evokes the outdoors

 

 

Ground level public space with water gardens and a central recycled-water “Pool of Knowledge” is shaped by curvilinear geometry. The podium-level garden is partially embedded in the ground and uses continuously circulating water to mask the sounds of the city.

Foundation construction for the iCarbonX headquarters is set for Fall 2019. It is slated for completion in 2021.

Related Stories

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

Mixed-Use | Mar 27, 2017

The Plant brings terrace-to-table living to Toronto

Curated Properties and Windmill Developments have teamed up to create a mixed-use building with food as the crux of the project.

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021