flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Senate kills bipartisan energy efficiency bill over Keystone pipeline amendment

Senate kills bipartisan energy efficiency bill over Keystone pipeline amendment

The legislation focused on energy efficiency standards such as water heaters with smart meters and cheaper heating and cooling systems for office buildings.


By BD+C Staff | May 22, 2014
The Keystone XL Pipeline is a proposed 1,179 mile (1,897 km), 36-inch-diameter c
The Keystone XL Pipeline is a proposed 1,179 mile (1,897 km), 36-inch-diameter crude oil pipeline which begins in Hardisty, Alta

Bipartisan legislation that focused on energy efficiency standards such as water heaters with smart meters, ways to reduce home utility bills, and cheaper heating and cooling systems for office buildings failed in the U.S. Senate earlier this month.

While the bill had broad support, the introduction of an amendment on the controversial Keystone XL pipeline poisoned the well.

Proposed by Rob Portman (R-Ohio), the Energy Savings and Industrial Competitiveness Act (ESIC) didn’t make it to a vote after the amendment was added to approve the Keystone pipeline extension ahead of the Obama Administration’s decision on whether to allow the pipeline to go forward.

As a result, Senate Majority Leader Harry Reid (D-Nev.) refused to allow a vote on a Keystone pre-approval amendment to the bill, and the amendment’s supporters retaliated by blocking a vote on the main bill.

Many Democrats and climate activists oppose the Keystone pipeline. Portman reportedly called the bill’s failure “yet another disappointing example of Washington’s dysfunction.”

(http://www.businessweek.com/articles/2014-05-13/keystone-xl-the-zombie-pipeline-kills-bipartisan-energy-bill/)

Related Stories

Architects | Oct 31, 2017

AIA selects recipients for the 2017 Innovation Awards

The program honors projects that highlight collaboration between design and construction teams to create better process efficiencies and overall costs savings.

Giants 400 | Oct 30, 2017

Top 130 green architecture firms

Gensler, Stantec, and HOK top BD+C’s ranking of the nation’s largest green sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Architects | Oct 30, 2017

City 2050: What will your city look like in 2050?

What do we think the future will look like 30 years or so from now? And what will City: 2050 be like?

Architects | Oct 25, 2017

Mason & Hanger appoints Ben Lilly as its new president

The firm expects to continue mining growth opportunities with its federal agency clients.  

Healthcare Facilities | Oct 25, 2017

Creating child-friendly healthcare spaces: Five goals for success

Children often accompany parents or grandparents in medical settings; what can we do to address their unique needs?

Giants 400 | Oct 24, 2017

Top 160 reconstruction architecture firms

Gensler, Jacobs, and Stantec top BD+C’s ranking of the nation’s largest reconstruction sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 20, 2017

Top 40 sports architecture firms

Populous, HOK, and HKS top BD+C’s ranking of the nation’s largest sports sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 19, 2017

Race for talent drives office designs

Is the shift toward attracting younger workers too much or not enough?

Sponsored | Designers | Oct 18, 2017

Universal design principles: Part 2

The CDC targets the bathroom as the most dangerous room in the house. Architects can use principles of Universal Design (UD)  to reduce these hazards. 

Giants 400 | Oct 17, 2017

Top 110 office architecture firms

Gensler, Jacobs, and HOK top BD+C’s ranking of the nation’s largest office sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021