flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

Mixed-Use

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

The mixed-use development will connect some of Detroit’s key public spaces.


By David Malone, Associate Editor | December 14, 2018
Monroe Blocks exterior

Courtesy Hayes Davidson

The northeast corner of Detroit’s Campus Martius Park will be home to Monroe Blocks, Schmidt hammer Lassen Architect’s first U.S. project. The project will span a 134,548-sf site across two city blocks and include the first high-rise office tower built in downtown Detroit in more than 25 years.

Monroe Blocks will include a mix of modern office space, residential units, restaurants, retail, and approximately 51,660 sf of public outdoor space. Schmidt Hammer Lassen will work with Neumann/Smith Architecture to reintroduce historic alleyways and public access points and prioritize the public realm by connecting the outdoors with each structure’s ground floor.

See Also: 62-story luxury rental tower provides 40,000 sf of indoor and outdoor amenities in Manhattan

 

Monroe Block retail spaceCourtesy Schmidt Hammer Lassen Architects.

 

The development is being built in an area that was known as Detroit’s first theater district. The National Theatre, the sole remaining building from this original theater district, will have its ornate terracotta archway incorporated into the Monroe Blocks design. It will be disassembled, catalogued, and relocated to a new pedestrian walkway that will bisect the new development.

 

Monroe Block interior office floorCourtesy Schmidt Hammer Lassen Architects.

 

A groundbreaking event recently took place on Monroe Banks Plot A, which will include a 35-storey glass and terracotta office tower, a 17-story, 148-unit residential building, and a total of 66,000 sf of retail space.

Monroe Blocks is scheduled to complete in early 2022.

 

Monroe Blocks aerial viewCourtesy Hayes Davidson.

 

Monroe Blocks courtyardCourtesy Hayes Davidson.

Tags

Related Stories

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

Mixed-Use | Feb 7, 2017

Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca

The Foster + Partners-designed building will address the shortage of accommodation in Mecca.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Mixed-Use | Jan 26, 2017

New renderings provide glimpse into large mixed-use project, Circa

The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021