flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

Mixed-Use

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

The mixed-use development will connect some of Detroit’s key public spaces.


By David Malone, Associate Editor | December 14, 2018
Monroe Blocks exterior

Courtesy Hayes Davidson

The northeast corner of Detroit’s Campus Martius Park will be home to Monroe Blocks, Schmidt hammer Lassen Architect’s first U.S. project. The project will span a 134,548-sf site across two city blocks and include the first high-rise office tower built in downtown Detroit in more than 25 years.

Monroe Blocks will include a mix of modern office space, residential units, restaurants, retail, and approximately 51,660 sf of public outdoor space. Schmidt Hammer Lassen will work with Neumann/Smith Architecture to reintroduce historic alleyways and public access points and prioritize the public realm by connecting the outdoors with each structure’s ground floor.

See Also: 62-story luxury rental tower provides 40,000 sf of indoor and outdoor amenities in Manhattan

 

Monroe Block retail spaceCourtesy Schmidt Hammer Lassen Architects.

 

The development is being built in an area that was known as Detroit’s first theater district. The National Theatre, the sole remaining building from this original theater district, will have its ornate terracotta archway incorporated into the Monroe Blocks design. It will be disassembled, catalogued, and relocated to a new pedestrian walkway that will bisect the new development.

 

Monroe Block interior office floorCourtesy Schmidt Hammer Lassen Architects.

 

A groundbreaking event recently took place on Monroe Banks Plot A, which will include a 35-storey glass and terracotta office tower, a 17-story, 148-unit residential building, and a total of 66,000 sf of retail space.

Monroe Blocks is scheduled to complete in early 2022.

 

Monroe Blocks aerial viewCourtesy Hayes Davidson.

 

Monroe Blocks courtyardCourtesy Hayes Davidson.

Tags

Related Stories

Mixed-Use | Aug 15, 2017

A golf course community converts into an agrihood with 1,150 homes and a working olive grove

The community will cover 300 acres in Palm Springs, Calif.

Mixed-Use | Aug 10, 2017

Mixed-use development includes University of California-San Diego campus extension

The 562,000-sf development was designed by Carrier Johnson + CULTURE and is located five blocks from the San Diego Padres’ Petco Park.

Mixed-Use | Aug 9, 2017

Mixed-use development will act as a gateway to Orange County’s ‘Little Saigon’

The development will include apartments, ground-floor retail, and a five-story hotel.

Mixed-Use | Aug 8, 2017

Dorte Mandrup’s 74,000-sm masterplan will be highlighted by an IKEA and BIG’s ‘Cacti’

The mixed-use development links a new IKEA store, a hotel, and housing with green space.

Mixed-Use | Aug 3, 2017

A sustainable mixed-use development springs from a Dutch city center like a green-fringed crystal formation

MVRDV and SDK Vastgoed won a competition to redevelop the inner city area around Deken van Someren Street in Eindhoven.

Mixed-Use | Aug 2, 2017

Redevelopment of Newark’s Bears Stadium site receives team of architects

Lotus Equity Group selected Michael Green Architecture, TEN Aquitectos, Practice for Architecture and Urbanism, and Minno & Wasko Architects and Planners to work on the project.

Retail Centers | Jul 20, 2017

L.A.’s Promenade at Howard Hughes Center receives a new name and a $30 million cash injection

Laurus Corporation and The Jerde Partnership will team up to rebrand the center as a family-friendly dining and entertainment destination.

Office Buildings | Jul 12, 2017

CetraRuddy unveils seven-story office building design for Staten Island’s Corporate Park

Corporate Commons Three is expected to break ground later this summer.

Mixed-Use | Jul 7, 2017

ZHA’s Mandarin Oriental hotel and residences employs ‘stacked vases’ design approach

The mixed-use tower will rise 185 meters and be located in Melbourne's Central Business District.

Office Buildings | Jun 27, 2017

Bloomberg’s European headquarters wants to become a natural extension of London

Foster + Partners’ design rises 10 stories and is composed of two connected buildings.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021