flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Safety concerns over wood-frame construction raised after Raleigh apartment fire

Codes and Standards

Safety concerns over wood-frame construction raised after Raleigh apartment fire

The unfinished building was destroyed in a five-alarm blaze.


By Peter Fabris, Contributing Editor | March 28, 2017

Pixabay Public Domain

After a massive five-alarm fire destroyed a partially constructed five-story, 241-unit, $51 million apartment building in Raleigh, the safety of wood-frame construction came under scrutiny.

The blaze also caused minor damage of a neighboring wood-framed, multi-family building and forced the evacuation of its residents. The Raleigh News & Observer subsequently published an extensive report on the pros and cons of wood-framed structures, interviewing professionals in the design and construction industry and developers.

The building, a pedestal structure with a poured-concrete first level and four stories of wood-frame construction above, was about 40% complete—making it vulnerable to fire. The president of Raleigh’s firefighter union told the newspaper that wood-frame buildings are safe once finished and after sprinklers installed. Before then, the structures are like a four-story lumber yard, the firefighter told the News & Observer.

North Carolina adopted a change to the national building code in 2009 that increased the number of wood-frame stories that can be built on a pedestal or slab from four to five.

Related Stories

Codes and Standards | Oct 15, 2020

Neighborhoods Now offers cost-effective, DIY designs in response to COVID-19 pandemic

Designs include barriers for outdoor dining, sidewalk retail displays, and modular seating for public spaces.

Codes and Standards | Oct 14, 2020

Standard contract document for prefab and modular building released

ConsensusDocs addresses the most common prefabricated construction use-case scenario.

Codes and Standards | Oct 13, 2020

Austin is first major Texas city to adopt wildfire code

New ordinance based on the International Wildland-Urban Interface Code.

Codes and Standards | Oct 12, 2020

Guidance offered for K-12 schools to support students with asthma

Green purchasing policies for cleaning, filters, furniture and other products encouraged.

Codes and Standards | Oct 7, 2020

More energy efficiency programs are encouraging zero-energy projects

At least 20 programs for new construction, major renovations emerge.

Codes and Standards | Oct 6, 2020

LEED, GBCI rating systems spur resilience-enhancing strategies

Expanded programs, resources address impact of climate change.

Codes and Standards | Oct 6, 2020

International Code Council to hold inaugural online education event

Week-long ICC Learn Live will include panel conversations, keynotes, and breakout sessions around key topics in building safety.

Codes and Standards | Oct 5, 2020

Guides addressing fenestration anchorage updated

First update to decade-old technical documents released.

Codes and Standards | Oct 1, 2020

Deadline extension for LEED 2009 project certifications

Delivery timeline delays due to COVID-19 pandemic prompt action.

Codes and Standards | Sep 29, 2020

New drinking water standard criteria further restricts lead leaching in plumbing products

Tightened standard applies to endpoint devices that dispense drinking water, and other plumbing components

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021