flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Safety concerns over wood-frame construction raised after Raleigh apartment fire

Codes and Standards

Safety concerns over wood-frame construction raised after Raleigh apartment fire

The unfinished building was destroyed in a five-alarm blaze.


By Peter Fabris, Contributing Editor | March 28, 2017

Pixabay Public Domain

After a massive five-alarm fire destroyed a partially constructed five-story, 241-unit, $51 million apartment building in Raleigh, the safety of wood-frame construction came under scrutiny.

The blaze also caused minor damage of a neighboring wood-framed, multi-family building and forced the evacuation of its residents. The Raleigh News & Observer subsequently published an extensive report on the pros and cons of wood-framed structures, interviewing professionals in the design and construction industry and developers.

The building, a pedestal structure with a poured-concrete first level and four stories of wood-frame construction above, was about 40% complete—making it vulnerable to fire. The president of Raleigh’s firefighter union told the newspaper that wood-frame buildings are safe once finished and after sprinklers installed. Before then, the structures are like a four-story lumber yard, the firefighter told the News & Observer.

North Carolina adopted a change to the national building code in 2009 that increased the number of wood-frame stories that can be built on a pedestal or slab from four to five.

Related Stories

Codes and Standards | Nov 4, 2020

Commercial building owners having tougher time securing insurance policies and renewals

Insurers’ fears of civil unrest in wake of election prompt builder’s risk coverage moratoriums.

Codes and Standards | Nov 4, 2020

Turn rooftops into revenue generators with solar arrays

Lease or ownership models for PVs make more sense than ever.

Codes and Standards | Nov 3, 2020

The argument against gas stoves includes degraded indoor air quality

Asthma seems to be aggravated by cooking with flame.

Codes and Standards | Nov 2, 2020

Wildfires can make drinking water toxic

Updated building codes could mitigate the danger.

Adaptive Reuse | Oct 26, 2020

Mall property redevelopments could result in dramatic property value drops

Retail conversions to fulfillment centers, apartments, schools, or medical offices could cut values 60% to 90%.

Codes and Standards | Oct 26, 2020

New seismic provisions for the National Earthquake Hazards Reduction Program released

The provisions present a set of recommended improvements to the ASCE/SEI 7-16 Standard.

Codes and Standards | Oct 22, 2020

More than 130 building projects have engaged LEED’s Safety First Credits in response to COVID-19

Best practices helping companies develop and measure healthy, sustainable, and resilient reopening efforts.

Codes and Standards | Oct 21, 2020

New technologies and techniques can ‘future-proof’ buildings

Net-zero principles may give buildings longer lives.

Codes and Standards | Oct 20, 2020

Updated AIA Contractor’s Qualification Statement and Warranty Bond documents available

Statement now includes safety protocols and plans, sustainability, and BIM experience.

Codes and Standards | Oct 19, 2020

NEXT Coalition chooses five pilot projects to fight COVID-19 on jobsites

Mobile platforms, wearable sensors, AI video systems among the trial solutions.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021