flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Roof collapse at Minnesota water park highlights failure to enforce codes

Codes and Standards

Roof collapse at Minnesota water park highlights failure to enforce codes

Rural areas say they can’t afford to enforce state-adopted building code.


By Peter Fabris, Contributing Editor | May 22, 2015
Roof collapse at Minnesota water park highlights failure to enforce codes

Some say that many governments in the Minneapolis metro area don't enforce building codes, which may have been the cause of a roof collapse at an indoor water park in the state. Image: Pixabay/jarmoluk

After the roof collapsed at the Thumper Pond Resort water park in Ottertail, Minn., last month, Minnesota media has highlighted the fact that many areas of the state do not enforce the state building code.

The roof collapse occurred around midnight on April 14 when the park was closed. There were no injuries. There were no high winds, snow, or other obvious causes indicating why the roof on the 10-year-old water park collapsed.

Many Minnesota governments outside the seven-county metro area that includes Minneapolis don't enforce the state building code, according to MPR News. That law requires inspections throughout a new construction process. But just 21 of the 87 Minnesota counties enforce it, according to the Minnesota Department of Labor and Industry.

Licensed contractors are required to build according to the state building code to construct a commercial or lodging facility in a remote area, but most of these projects proceed without a building official to provide oversight. Rural governments say they can’t afford to provide that service.

Related Stories

| Sep 15, 2011

Bill Seeks To Spur Stronger Building Codes Nationwide

The Safe Building Code Incentive Act of 2011 would provide strong financial incentives for states to adopt and enforce strong building codes.  

| Sep 15, 2011

New Federal Law Limits Amount of Formaldehyde in Wood

President Obama signed into law legislation that limits the amount of formaldehyde in wood. The new measure will impact particle board and other composite wood products .

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 8, 2011

OSHA issues alert on incorrectly rebuilt circuit breakers

The Occupational Safety and Health Administration (OSHA) has issued a hazard alert, warning workers and employers of certain Eaton/Cutler-Hammer molded-case circuit breakers that were incorrectly rebuilt. 

| Sep 8, 2011

USGBC Streamlines LEED EB: O&M

The Council has reorganized the prerequisite and credit structure of LEED EB: O&M. 

| Sep 8, 2011

USGBC: 30 Legislative ‘Wins For Green Building’ So Far In 2011

A mid-year report by the U.S. Green Building Council says that there have been “30 legislative wins for green building” across 22 states in 2011. 

| Sep 8, 2011

Revised Building Codes Adopted After WTC Attacks Being Implemented

U.S. National Institute of Standards and Technology (NIST) code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction including One World Trade Center, the lead building of the new World Trade Center complex. 

| Sep 8, 2011

New Sustainability Standard Addresses Disaster Resistance

To aid local governments to adopt high-performance green building codes, the Portland Cement Association (PCA) and the Institute for Business and Home Safety (IBHS) have developed High Performance Building Requirements for Sustainability 2.0. 

| Sep 8, 2011

Pilot ISO 50001 Implementations Report Big Energy Savings

The International Organization for Standardization (ISO) recently published ISO 50001 to provide a recognized framework for integrating energy performance into management practices. 

| Sep 8, 2011

USGBC Revises Energy Demand Response Credit

Originally launched in 2010, the revised and enhanced Demand Response Pilot Credit establishes guidelines that are anticipated to increase participation in automated energy demand response programs.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021