flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The renovation of the business school at St. John’s University looks to keep up with the Joneses

Higher Education

The renovation of the business school at St. John’s University looks to keep up with the Joneses

A nearly 40-year-old space is opened up and modernized.


By John Caulfield, Senior Editor | July 24, 2017

A “financial lab,” encased within glass walls, is one of the newest features in the renovation of St. John's University's business school. Image: Shawmut Design and Construction

Earlier this month, Shawmut Design and Construction put the finishing touches on its renovation and expansion of the Peter J. Tobin College of Business, a 70,000-sf building located on the Queens, N.Y., campus of St. John’s University.

This building—named after an alumnus and former CFO of Chase Manhattan Bank—first opened in the late 1970s. At a renovation cost of $22 million, this was the largest Higher Ed project to date in New York for Shawmut’s Institutional group. Its 43-week completion schedule included $800,000 in demolition related to a complete interior gutting of the building. (During this project, business students attended classes in other buildings on campus.)

There were between 70 and 100 people working on this project at any given time.

Shawmut Vice President Anthony Miliote says his firm and Cannon Design, the project’s architect, managed to trim the project’s cost from its original budget of about $24.5 million. “Cannon was very pragmatic,” says Miliote, about making modifications to more reasonably priced materials and mechanical systems.

 

The lobby of the Peter J. Tobin College of Business at St. John's UniversityThe $22 million renovation included an expanded lobby area. Image: Shawmut Design and Construction.

 

In the process, the Building Team updated the space by creating an expanded lobby area, and a high-tech “financial lab,” which Miliote explains is a large classroom/lecture space with computers.

The top two floors are mostly offices for faculty, and the bottom two classrooms. A 503-sf central staircase, with seating steps and ramp, connects the floors. And a horseshoe-shaped atrium provides more transparency throughout the building.

The exterior of the building was pretty much kept intact. The revised front façade involved about 900 sf of curtainwall and storefront glazing, which lets more natural light into the building. The entryway, says Miliote, also got new hard- and landscaping.

A 960-sf outdoor patio with a sloped glass entry was installed where a loading dock roof had once been. And the business school now includes a large multi-purpose space, student study areas, collaboration areas, a career service center, and a start-up incubator lab.

Shawmut is still doing some work for St. John’s, as well as academic projects with NYU Langone, Columbia University and Columbia Medical School, Riverdale Country School, and The Buckley School.

“A lot of this work is about keeping up with the Joneses, enhancing the student experience, and adapting to changing technology,” says Miliote. 

Related Stories

Energy Efficiency | Dec 13, 2016

A Massachusetts college now features the largest zero-net-energy academic building in Northeast

Bristol Community College wants to be carbon neutral by 2050.

Higher Education | Dec 8, 2016

A STEM-focused building creates a new axis on the campus of Lawrence Technological University

A giant carbon-fiber orb is a focal point for the Michigan-based school. 

Higher Education | Nov 17, 2016

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

The building marks the first purpose built structure for cyber studies based at an academy.

Higher Education | Nov 9, 2016

Social connection in academic and student housing environments

Universities value an active and vibrant campus, and wish to create places that welcome newcomers and offer support.

Higher Education | Oct 20, 2016

Designing innovative campuses for tomorrow's students

Planning for places that foster effective innovation is still an emerging process, but the constant pressure on universities to do so continues from two of their key institutional constituencies—students and employers, writes Perkins+Will's Ken Higa and Josh Vel.

University Buildings | Sep 12, 2016

The University of Chicago’s newest residence halls are designed to be more like home

Abundant common spaces give students more chances to interact.

Education Facilities | Sep 9, 2016

Education Facility Design Award winners: The AIA Committee on Architecture for Education honors 12 projects

The best new learning centers showcase latest design trends in education.

University Buildings | Aug 17, 2016

Supporting communities of motivated learners: reflections on SCUP-51

The two themes that were consistently woven into different topics were institutional transformation and connection with students.

University Buildings | Aug 16, 2016

New images of Rice University’s Moody Center for the Arts revealed by Michael Maltzan Architecture

The arts center will foster creativity for making and presenting works across all disciplines

| Aug 10, 2016

UNIVERSITY GIANTS: Facing money woes, the nation's colleges double down on innovative ideas

Budget constraints are compelling some public institutions to pursue alternative methods of financing their major building projects. 

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021