flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The renovation of the business school at St. John’s University looks to keep up with the Joneses

Higher Education

The renovation of the business school at St. John’s University looks to keep up with the Joneses

A nearly 40-year-old space is opened up and modernized.


By John Caulfield, Senior Editor | July 24, 2017

A “financial lab,” encased within glass walls, is one of the newest features in the renovation of St. John's University's business school. Image: Shawmut Design and Construction

Earlier this month, Shawmut Design and Construction put the finishing touches on its renovation and expansion of the Peter J. Tobin College of Business, a 70,000-sf building located on the Queens, N.Y., campus of St. John’s University.

This building—named after an alumnus and former CFO of Chase Manhattan Bank—first opened in the late 1970s. At a renovation cost of $22 million, this was the largest Higher Ed project to date in New York for Shawmut’s Institutional group. Its 43-week completion schedule included $800,000 in demolition related to a complete interior gutting of the building. (During this project, business students attended classes in other buildings on campus.)

There were between 70 and 100 people working on this project at any given time.

Shawmut Vice President Anthony Miliote says his firm and Cannon Design, the project’s architect, managed to trim the project’s cost from its original budget of about $24.5 million. “Cannon was very pragmatic,” says Miliote, about making modifications to more reasonably priced materials and mechanical systems.

 

The lobby of the Peter J. Tobin College of Business at St. John's UniversityThe $22 million renovation included an expanded lobby area. Image: Shawmut Design and Construction.

 

In the process, the Building Team updated the space by creating an expanded lobby area, and a high-tech “financial lab,” which Miliote explains is a large classroom/lecture space with computers.

The top two floors are mostly offices for faculty, and the bottom two classrooms. A 503-sf central staircase, with seating steps and ramp, connects the floors. And a horseshoe-shaped atrium provides more transparency throughout the building.

The exterior of the building was pretty much kept intact. The revised front façade involved about 900 sf of curtainwall and storefront glazing, which lets more natural light into the building. The entryway, says Miliote, also got new hard- and landscaping.

A 960-sf outdoor patio with a sloped glass entry was installed where a loading dock roof had once been. And the business school now includes a large multi-purpose space, student study areas, collaboration areas, a career service center, and a start-up incubator lab.

Shawmut is still doing some work for St. John’s, as well as academic projects with NYU Langone, Columbia University and Columbia Medical School, Riverdale Country School, and The Buckley School.

“A lot of this work is about keeping up with the Joneses, enhancing the student experience, and adapting to changing technology,” says Miliote. 

Related Stories

University Buildings | Aug 8, 2017

Student center(ed): Is the student union the key to retention?

Studies indicate that the longer a student remains on campus—and in an academic mindset—the greater their chance for academic growth and success.

Healthcare Facilities | Aug 8, 2017

Kansas’ only medical school receives new 171,000-sf building

The building was designed to enhance the medical campus’ existing facilities, curriculum, and classrooms.

Laboratories | Aug 3, 2017

Today’s university lab building by the numbers

A three-month study of science facilities conducted by Shepley Bulfinch reveals key findings related to space allocation, size, and cost. 

University Buildings | Jun 29, 2017

Duke University’s new alumni and visitors center is a ‘modern adaptation of the campus’ architectural style’

The project will total about 47,000 sf of new construction and renovations.

Sustainability | Jun 28, 2017

Mohawk College will have one of the region’s first net-zero energy institutional buildings

The project’s net-zero goals led to the development of a new curtain wall system.

University Buildings | Jun 21, 2017

Student residence hall in Lisbon takes biophilic design to the next level

The luxury student accommodations will be Collegiate’s first outside of the U.K.

Building Team Awards | Jun 7, 2017

Blurring the lines: University of Chicago North Residential Commons

Gold Award: The University of Chicago’s new Residential Commons is part campus, part community.

Higher Education | Jun 7, 2017

Building for the future: Five trends in higher education projects

Preparing students for life after graduation has become the primary motivator behind construction initiatives at U.S. colleges and universities.

Higher Education | Jun 6, 2017

Funding remains a concern, but not always an impediment

Colleges and universities are adept at tapping a variety of sources—taxpayers, investors, donors, and, yes, students—to fund their growth ambitions.

Higher Education | May 31, 2017

Space utilization in higher education: more than sf per student

There’s more to space utilization than how often a room is occupied. What happens inside an occupied room is just as important.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021