flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction of Hall of Fame football stadium in Ohio moving forward

Sports and Recreational Facilities

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.


By John Caulfield, Senior Editor | August 29, 2016

A new 23,000-seat football stadium will be a centerpiece within a retail/sports/entertainment/lifestyle village associated with the Pro Football Hall of Fame in Canton, Ohio.  Image: HKS

The steel structure for a new 23,000-seat football stadium that will be part of the $500 million, 90-acre Hall of Fame Village in Canton, Ohio, should be visible to travelers on Interstate 77 by next Christmas.

The old stadium’s north and south stands have been demolished, and the press box—which was built in 2009—will meet the wrecking ball next week, to be replaced by a larger area for media.

The new facility, called Tom Benson Hall of Fame Stadium and formerly known as Fawcett Stadium, is on schedule to be completed in time for next year’s Pro Football Hall of Fame enshrinement festival, although some elements won’t be completed until 2018. The stadium’s cost alone is projected to exceed $80 million.

Tom Benson, who owns the New Orleans Saints pro football team, has donated $11 million to the Hall of Fame, nearly all of it earmarked for the stadium reconstruction. The state is kicking in $10 million, and the city of Canton $5 million for the new stadium. The Canton City Schools owns the stadium, but will only be on the hook for its maintenance.

HKS’s Sports and Entertainment Group is the stadium’s designer, working with clients Industrial Realty Group and the Pro Football Hall of Fame.

The 76-year-old Fawcett Stadium has been a high school field. Its ticket booths are among the artifacts being preserved for future display within the Village.

This fall, construction begins on the Hall of Fame Village that will involve between 400 and 500 workers.

There are eight components to Hall of Fame Village, according to its website:

•The Pro Football Hall of Fame Museum

•Tom Benson Hall of Fame Stadium/Sports & Entertainment Complex, which will include a first-of-its-kind permanent stage that will be embedded into the stadium’s seating bowl and located at midfield. The field is being lowered by 12 feet to accommodate a fan plaza that connects to the Hall of Fame museum.

•A four-star Hotel & Conference Center

•Legends Landing/Residential (an assisted living facility, some of which could be housing for retired pro football players)

•A state-of-the-art Youth Sports Complex, which is already underway

•Center for Excellence (Coaches University; Academy of Corporate Excellence; Officiating Clinics; Safety, Health & Performance Center)

•Main Street Hall of Fame (restaurants, retail)

•Hall of Fame/NFL Family Experience (high-tech virtual reality experiences and rides)

An economic feasibility study indicates that Hall of Fame Village will create more than 13,000 new jobs, and over a 25-year period will generate $15.3 billion in net new total economic output within Stark County, Ohio.

Related Stories

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 16, 2011

Largest solar installation completed at Redskins' football stadium

On game days, solar power can provide up to 20% of FedExField’s power.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021