flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction of Hall of Fame football stadium in Ohio moving forward

Sports and Recreational Facilities

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.


By John Caulfield, Senior Editor | August 29, 2016

A new 23,000-seat football stadium will be a centerpiece within a retail/sports/entertainment/lifestyle village associated with the Pro Football Hall of Fame in Canton, Ohio.  Image: HKS

The steel structure for a new 23,000-seat football stadium that will be part of the $500 million, 90-acre Hall of Fame Village in Canton, Ohio, should be visible to travelers on Interstate 77 by next Christmas.

The old stadium’s north and south stands have been demolished, and the press box—which was built in 2009—will meet the wrecking ball next week, to be replaced by a larger area for media.

The new facility, called Tom Benson Hall of Fame Stadium and formerly known as Fawcett Stadium, is on schedule to be completed in time for next year’s Pro Football Hall of Fame enshrinement festival, although some elements won’t be completed until 2018. The stadium’s cost alone is projected to exceed $80 million.

Tom Benson, who owns the New Orleans Saints pro football team, has donated $11 million to the Hall of Fame, nearly all of it earmarked for the stadium reconstruction. The state is kicking in $10 million, and the city of Canton $5 million for the new stadium. The Canton City Schools owns the stadium, but will only be on the hook for its maintenance.

HKS’s Sports and Entertainment Group is the stadium’s designer, working with clients Industrial Realty Group and the Pro Football Hall of Fame.

The 76-year-old Fawcett Stadium has been a high school field. Its ticket booths are among the artifacts being preserved for future display within the Village.

This fall, construction begins on the Hall of Fame Village that will involve between 400 and 500 workers.

There are eight components to Hall of Fame Village, according to its website:

•The Pro Football Hall of Fame Museum

•Tom Benson Hall of Fame Stadium/Sports & Entertainment Complex, which will include a first-of-its-kind permanent stage that will be embedded into the stadium’s seating bowl and located at midfield. The field is being lowered by 12 feet to accommodate a fan plaza that connects to the Hall of Fame museum.

•A four-star Hotel & Conference Center

•Legends Landing/Residential (an assisted living facility, some of which could be housing for retired pro football players)

•A state-of-the-art Youth Sports Complex, which is already underway

•Center for Excellence (Coaches University; Academy of Corporate Excellence; Officiating Clinics; Safety, Health & Performance Center)

•Main Street Hall of Fame (restaurants, retail)

•Hall of Fame/NFL Family Experience (high-tech virtual reality experiences and rides)

An economic feasibility study indicates that Hall of Fame Village will create more than 13,000 new jobs, and over a 25-year period will generate $15.3 billion in net new total economic output within Stark County, Ohio.

Related Stories

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| May 7, 2012

2012 BUILDING TEAM AWARDS: TD Ameritrade Park

The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.

| Apr 6, 2012

Perkins Eastman unveils Qatar mixed-use sports complex

Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021