flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ransom Everglades School’s new STEM facility to emphasize flexibility

Education Facilities

Ransom Everglades School’s new STEM facility to emphasize flexibility

Perkins+Will is designing the building.


By David Malone, Associate Editor | April 18, 2019

All renderings courtesy Perkins+Will

Ransom Everglades School’s new 45,000-sf, three-story STEM facility will be a flexible space with the ability to adapt to a variety of learning needs, according to new details released by Perkins+Will, the project’s architect. The STEM facility is part of the larger master plan for the school’s Coconut Grove campus.

The building will feature 10 classrooms with movable walls and furniture, maker and fabrication labs, an outdoor rooftop lab, rooftop solar panels, a multi-purpose conference room, and a 200 person auditorium. The facility will include laboratories for earth sciences, biology, chemistry, and physics.

 

Students working a lab space

 

“It will be flexible, adaptable, collaborative; a think-tank type space,” said Pat Bosch, Design Director for Perkins+Will’s Miami office, while speaking to Ransom Everglades parents at a preview for the new building. “This is not a static building.”

The collaboration will pour out of the building and spill into the surrounding landscape as well. The project will create new outdoor breakout areas adjacent to the STEM building and a new quad. This connection between indoor and outdoor learning spaces is an important aspect of the new facility, which is slated to be ready for occupancy by early 2020.

 

Ransom Everglades stem building exterior

 

Breakout space in ransom everglades stem building

Related Stories

Education Facilities | Jan 8, 2019

Greenwich Village’s Grace Church School receives rooftop athletic center expansion

Murphy Burnham & Buttrick Architects designed the addition.

Education Facilities | Oct 31, 2018

BIG and WeWork collaborate on the first WeGrow school in NYC

WeWork is designed to help children learn through introspection, exploration, and discovery.

Education Facilities | Oct 18, 2018

Perkins+Will-designed, STEM-focused elementary school opens in Dallas

The school will accommodate 900 students each year.

University Buildings | Oct 8, 2018

One size doesn't fit all: Student housing is not a pair of socks

While the programming and design for these buildings all kept a holistic living/learning experience at the core, they also had amazingly different outcomes.

Education Facilities | Sep 20, 2018

Teen Center of Excellence under construction in Ferguson, Mo.

Arcturis is the Architect for the project.

Education Facilities | Sep 12, 2018

Security vs. 21st century learning: We shouldn’t have to choose

In order to effectively talk about school design, we need to start by understanding what a school is designed to do. 

Education Facilities | Sep 12, 2018

350,000-sf High Tech High School opens in Secaucus, N.J.

The technical school is on the Frank J. Cargiulo Campus.

Education Facilities | Aug 24, 2018

Encourage student wellness by incorporating active design into college campus architecture

Before you incorporate active design into your college campus, you need to understand exactly what doing so entails.

Education Facilities | Aug 21, 2018

Meet the new vo-techs

Career and technical education is preparing K-12 students earlier than ever for college and the job market.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021