flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ransom Everglades School’s new STEM facility to emphasize flexibility

Education Facilities

Ransom Everglades School’s new STEM facility to emphasize flexibility

Perkins+Will is designing the building.


By David Malone, Associate Editor | April 18, 2019

All renderings courtesy Perkins+Will

Ransom Everglades School’s new 45,000-sf, three-story STEM facility will be a flexible space with the ability to adapt to a variety of learning needs, according to new details released by Perkins+Will, the project’s architect. The STEM facility is part of the larger master plan for the school’s Coconut Grove campus.

The building will feature 10 classrooms with movable walls and furniture, maker and fabrication labs, an outdoor rooftop lab, rooftop solar panels, a multi-purpose conference room, and a 200 person auditorium. The facility will include laboratories for earth sciences, biology, chemistry, and physics.

 

Students working a lab space

 

“It will be flexible, adaptable, collaborative; a think-tank type space,” said Pat Bosch, Design Director for Perkins+Will’s Miami office, while speaking to Ransom Everglades parents at a preview for the new building. “This is not a static building.”

The collaboration will pour out of the building and spill into the surrounding landscape as well. The project will create new outdoor breakout areas adjacent to the STEM building and a new quad. This connection between indoor and outdoor learning spaces is an important aspect of the new facility, which is slated to be ready for occupancy by early 2020.

 

Ransom Everglades stem building exterior

 

Breakout space in ransom everglades stem building

Related Stories

University Buildings | Mar 27, 2019

Veterans Resource Center at Cypress College breaks ground

Sundt Construction is building the project.

Education Facilities | Mar 8, 2019

Nature preserve on the Yangtze River will restore biodiversity to a polluted area

Ennead Architects, in partnership with Andropogon Landscape Architects, is designing the project.

Education Facilities | Feb 23, 2019

Construction completed on classroom/dorm combo building on Worcester Polytechnic’s campus

The latest addition embodies the school’s emphasis on collaborative problem-solving.

Libraries | Feb 10, 2019

New library branch in San Diego opens with its community’s learning and working traits in mind

It features larger gathering spaces and more technology than its predecessor.

Green | Jan 28, 2019

This is the country’s greenest academic building

Perkins+Will designed the building.

Education Facilities | Jan 22, 2019

Rethinking classroom design to promote collaboration

A dynamic learning space needs to center around the learner, and be flexible enough to transform into any configuration that will facilitate collaboration, especially as curriculums change.

Education Facilities | Jan 21, 2019

N.J. middle school puts its small site to use

The school is named in honor of Martin Luther King, Jr.’s vision of the “Beloved Community.”

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021