flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Public-private partnership used to fund Long Beach Civic Center Project

Government Buildings

Public-private partnership used to fund Long Beach Civic Center Project

Arup served as a lead advisor and oversaw financial, commercial, real estate, design, engineering, and cost consulting.


By BD+C Editors | April 22, 2016
Public-private partnership used to fund Long Beach Civic Center Project

Long Beach Civic Center. Plenary Properties Long Beach LLC (developer), Edgemoor Infrastructure and Real Estate and Clark Construction (contractor), Skidmore Owings & Merrill (architect)

Arup announced that the City of Long Beach and Port of Long Beach have reached financial close for the $520 million Long Beach Civic Center Project.

The project includes a new city hall, port HQ, main library, public park, and street improvements. All the features are designed to be occupied within a week of a major earthquake and meet REDi Gold earthquake performance, an operational resilience rating system developed by Arup.

A public-private partnership (P3) was used to fund the project, which combines public infrastructure and private mixed-use real estate development into one design-build-finance-operate-maintain arrangement.

Arup, the global interdisciplinary consulting and design services firm, served as lead advisor to the city and Port of Long Beach. The firm led financial, commercial, real estate, design, engineering, and cost consulting advisory services. 

 

Long Beach, Calif. Photo: Zen Skillicorn/Creative Commons.

 

The Arup team included HOK for architecture consulting, BAE for real estate economics, and MBI Media for outreach. Sheppard Mullin provided legal advice to the owners.

Plenary Group is the lead P3 developer, sole equity provider, and financial arranger for the consortium, which includes Clark Construction, Edgemoor, Johnson Controls, and SOM. 

Allianz, in a private placement, is providing $237 million in long-term financing. Sumitomo Mitsui Banking Corp. is providing a $213 million loan. Long Beach would contribute $11.8 million in cash and land valued at nearly $30 million. Plenary is contributing $21 million in equity.

Arup managed the entire process from the RFP to the end of negotiations and helped the project become a reality quicker than expected.

"A significant value added for the city is how the P3 model accelerated what would more conventionally have been a three- to five-year project development process using traditional project delivery methods to a two-year process," Orion Fulton, Arup's project team leader, said. 

Arup has served as an advisor for numerous projects, including Presidio Parkway in San Francisco, the Los Angeles Convention Center, and the New Champlain Bridge in Quebec.

Construction has begun, and the next phase of the project is being launched.

Related Stories

| Jul 18, 2014

Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]

“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.

| Jul 18, 2014

Top Construction Management Firms [2014 Giants 300 Report]

Jacobs, Barton Malow, Hill International top Building Design+Construction's 2014 ranking of the largest construction management and project management firms in the United States. 

| Jul 18, 2014

Top Contractors [2014 Giants 300 Report]

Turner, Whiting-Turner, Skanska top Building Design+Construction's 2014 ranking of the largest contractors in the United States. 

| Jul 18, 2014

Engineering firms look to bolster growth through new services, technology [2014 Giants 300 Report]

Following solid revenue growth in 2013, the majority of U.S.-based engineering and engineering/architecture firms expect more of the same this year, according to BD+C’s 2014 Giants 300 report. 

| Jul 18, 2014

Top Engineering/Architecture Firms [2014 Giants 300 Report]

Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.

| Jul 18, 2014

Top Engineering Firms [2014 Giants 300 Report]

Fluor, Arup, Day & Zimmermann top Building Design+Construction's 2014 ranking of the largest engineering firms in the United States.

| Jul 18, 2014

Top Architecture Firms [2014 Giants 300 Report]

Gensler, Perkins+Will, NBBJ top Building Design+Construction's 2014 ranking of the largest architecture firms in the United States. 

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

| Jul 17, 2014

A harmful trade-off many U.S. green buildings make

The Urban Green Council addresses a concern that many "green" buildings in the U.S. have: poor insulation.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021