Mortenson Construction has released "Integrated Delivery: A Catalyst for Collaboration and Teamwork." The free report summarizes findings from a large group seminar conducted by the contractor at the 2013 AIA Public Architect Workshop, which was held in conjunction with this year's AIA National Convention. Hand-held polling devices were used for collecting feedback and real-time tabulations.
According to the report, interest in IPD is high, but public owners don't always agree on the meaning of the term, and are unsure whether formal multiparty agreements are necessary to achieve the desired goals. Some of the seminar participants said that sharing of risks and rewards is what distinguishes a true integrated delivery model. Others believed the general principles can be applied to multiple types of delivery methods. In general, the idea of integrated delivery involves trust, communication, and a high level of commitment among all involved parties.
The study examines the differences between a contractually defined version of IPD and a version that incorporates the basic principles but not the contracual approach (labeled "ipd.") Regardless of what a method is called, the report indicates that stakeholders for public projects are increasingly interested in methods beyond traditional design-bid-build, with CM at Risk and IPD both selected as the method of "greatest growth in interest" by more than 30% of the respondents.
Despite the attendees' lack of clarity regarding the definition of IPD/ipd, about three quarters believe some type of nontraditional approach will increase the level of teamwork on a project (73%). They also tend to believe IPD will increase collaborative innovation and decisionmaking (64%), shared benefit and reward (55%), mutual respect and trust among participants (55%), harnessing of the talents, expertise, and information of the participants (55%), and shared risks and downside (50%). Only 36% thought IPD would increase the use of VDC/BIM.
Related Stories
| Mar 15, 2013
Singapore R&D campus takes top honor in Lab of Year competition
Singapore CREATE R&D campus takes top honor in Lab of Year competition, sponsored by R&D Magazine.
| Mar 15, 2013
7 most endangered buildings in Chicago
The Chicago Preservation Society released its annual list of the buildings at high risk for demolition.
| Mar 14, 2013
25 cities with the most Energy Star certified buildings
Los Angeles, Washington, D.C., and Chicago top EPA's list of the U.S. cities with the greatest number of Energy Star certified buildings in 2012.
| Mar 14, 2013
How to win more work from community colleges
The nation’s thousand-plus community college districts can be a steady source of income for your Building Team—provided you appreciate the special needs of this important sector of the higher education market.
| Mar 13, 2013
Replacement escalators give Cobo Center a lift
New elevator technology enables Detroit’s Cobo Center to replace its escalators without disruption to its convention business.
| Mar 12, 2013
'World's greenest' office building seeks tenants in Seattle
Superefficient Seattle office building is designed to meet the ambitious goals of the Living Building Challenge.
| Mar 10, 2013
Walgreens to build first net-zero energy retail store
Walgreens announced plans last week to build one of the nation's first net-zero retail stores. The Evanston, Ill., location will utilize solar panels, wind turbines, geothermal technology, LED lighting and ultra-high-efficiency refrigeration to produce energy equal to or greater than the building consumes.
| Mar 7, 2013
Vegas rebound: Genting Group acquires assets of stalled Vegas casino-resort
International hospitality giant Genting Group has announced a deal with Boyd Gaming Corp. to purchase the land and assets, including partially built structures, of the stalled Echelon casino-resort in Las Vegas.