flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Product Solutions June 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.


By By Raissa Rocha, Associate Editor | May 31, 2012
This article first appeared in the June 2012 issue of BD+C.

LOW-EMISSION PRODUCTS HELP MEET HIGH-PERFORMANCE STANDARDS

A new line of Dow Epoxy products feature high-performance D.E.H. curing agents. The portfolio includes epoxy components,specialty resins, curing agents, resin blends, and formulated hardener solutions. Specialty offerings in the expanded epoxy portfolio include low-emission and waterborne curing agents. The next-generation D.E.H. 800 waterborne series curing agents are particularly useful in flooring and indoor locations where organic solvents need to be avoided. Benefits include low odor, rapid drying and curing for faster application, and curing ability at low temperatures to allow application in a variety of seasons.

Dow Epoxy

Circle No. 806 on Reader Service Card

NEW COMMERCIAL FAUCETS PROVIDE MODERN STYLE, WATER SAVINGS

Designed for the commercial plumbing industry, the new 3500 Series of water metering faucets provides a modern look for offices, retail stores, restaurants, and hospitality settings. The self-closing MVP metering cartridge provides precise water flow and shuts off automatically, conserving water. The series’ solid ECAST brass, chrome-plated body meets local requirements for the reduction of lead in plumbing fixtures. Pre-installed stainless steel hoses connect to standard water supplies. Internal temperature control is accessible above the deck for easy adjustment.

Chicago Faucets

Circle No. 807 on Reader Service Card

WALL-CLADDING SYSTEMS GIVE EDGE TO INTERIOR SPACES

Edge interior cladding systems come in four configurations and can also be customized to fit a wide range of spaces. Made with 3form Studio’s Varia Ecoresin material and available in thousands of C3 color interlayers, Edge systems allow Building Teams to refine hues, intensify colors, and alter light transmission to any desired effect, creating a contoured, motion-filled look to interior spaces. Edge systems are premade wall-cladding solutions for 3form’s collection of Ready to Go packages.

3form Studio

Circle No. 808 on Reader Service Card

Related Stories

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021